Part 11 · Power and Energy
Boilers and Pressure Vessels
How to build boilers bigger and stronger than the small copper pot of the first steam engine — Cornish, fire-tube and water-tube designs, riveted iron seams, the water test, safety valves, water gauges, feedwater and scale — and the habits that keep a boiler from exploding. Pressure cookers and canners obey the same rules.
- Difficulty
- ●●●●●
- Time
- Months to build a large boiler; a day for the water test; daily care for as long as it runs
- Steps from zero
- 24 prerequisites →
The full path from nothing — 24 steps before this one
- Fire
- Cordage and Rope
- Stone Tools
- Finding and Preparing Clay
- Finding and Identifying Ores
- Hunting and Trapping
- Basic Woodworking
- Charcoal
- Pottery
- The Kiln
- Hides and Leather
- Bricks
- The Wheel and Axle
- Firebrick and Refractories
- Bellows
- The Lathe
- Gears
- Iron (the Bloomery)
- Copper Smelting
- The Waterwheel
- Blacksmithing
- The Blast Furnace and Cast Iron
- Sheet Metal and Rolling
- The Steam Engine
- Boilers and Pressure Vessels
Do them roughly in this order. See it on the tech tree →
Why it matters
The small copper boiler in The Steam Engine runs a pump at 1 bar. A The Steam Turbine for an Power Lines and Distribution, a locomotive, Steamships or a factory driving Machine Tools needs a boiler that makes hundreds of kilograms of steam an hour at several bar, for decades.
It is also the most dangerous machine most societies ever build. In the 1800s boilers in the United States and Britain exploded more than once a week, killing thousands — almost always from one of five preventable causes. The basic rules — shape, the dead-weight safety valve, try-cocks, the fusible plug, the water test — are in The Steam Engine; read that first. This chapter builds on it.
How it works
Pressure and temperature go together. Trapped steam raises the boiling point, so the water inside is far hotter than in an open pot:
| Pressure (bar above the air) | 0 | 1 | 3 | 7 | 10 |
|---|---|---|---|---|---|
| Water and steam temperature | 100 °C | 120 °C | 144 °C | 170 °C | 184 °C |
Why boilers explode. If the shell tears, the pressure falls to that of the air in an instant. Water at 170 °C is now far above its boiling point, so about an eighth of it flashes into steam at once, expanding 1,700 times. A large boiler holds tonnes of water; it is the water flashing to steam that throws the shell like a rocket and levels the building.
What a boiler wall feels. Pressure inside a cylinder tries to split it along its length (the hoop stress) twice as hard as it tries to pull the ends off (the longitudinal stress). So the seams that run along the boiler must be the strongest. The required plate thickness is given in Sheet Metal and Rolling:
thickness = pressure × diameter ÷ (2 × allowable stress × joint efficiency)
Double the diameter and you must double the thickness — which is why small tubes stand enormous pressure with thin walls.
Two families. In a fire-tube boiler the hot gases pass through tubes or flues inside a big shell of water. In a water-tube boiler the water is inside many small tubes and the fire is outside them. Fire-tube boilers are simpler and hold a lot of water, but the big shell limits the pressure. Water-tube boilers reach high pressures safely but need good tubes and very clean water.
The boilers, from simplest to best
| Type | Shape | Usual working pressure | Notes |
|---|---|---|---|
| Pot or haystack | A dome or kettle over a fire, brick-set | Under 0.5 bar | Newcomen's engines. Easy, wasteful, weak |
| Wagon | Long box with a curved top, fire underneath | Under 0.5 bar | Watt's engines. Flat sides need many stays |
| Cornish | Long cylinder, 1.5–2 m across, 7–10 m long, with one large flue carrying the fire through the water | 3–4 bar at first, later up to 8 | Trevithick, about 1812. Brick flues carry the gases back along the outside too |
| Lancashire | Like the Cornish, 2–3 m across, but two flues | 7–10 bar | Fairbairn, 1844. The great factory boiler of the 1800s |
| Vertical | Upright cylinder with an inner firebox and a few cross-tubes or a nest of small tubes | 3–7 bar | Small, cheap, needs little floor space. Good first "real" boiler |
| Locomotive / return-tube | Firebox at one end, many small fire-tubes (5 cm) through the water | 7–15 bar | Huge heating surface for its size; firebox needs hundreds of stays |
| Water-tube | Steam drum above, banks of small water-filled tubes over the fire | 10 bar and far higher | Babcock & Wilcox, 1867. A burst tube is a bad leak, not a disaster |
For a rebuilding community: go from the copper pot to a vertical boiler or a small return-tube boiler of wrought iron or mild steel, working at 3–4 bar. Build a Lancashire or Cornish boiler when you have a rolling mill that can make large thick plate, and a water-tube boiler when you can make reliable seamless or lap-welded tubes and keep the water clean.
Flues collapse. Boiler water presses inward on a flue, and a tube squeezed from outside does not bulge gently — it collapses flat. Stiffen long flues with rings riveted round them every metre or so, or build them in short flanged sections.
Flat surfaces must be stayed. Tie the flat ends of a shell boiler together with bar stays and to the shell with triangular gusset stays. In a firebox, join inner and outer plates with screwed stays every 10–12 cm, each with a 5 mm tell-tale hole drilled into its outer end: if a stay cracks, steam whistles out and warns you.
What you need
| Item | Notes |
|---|---|
| Plate | Wrought iron (Iron (the Bloomery), puddled from The Blast Furnace and Cast Iron) or mild steel (Steel in Quantity), rolled flat in a mill (Sheet Metal and Rolling). Never cast iron for any part under steam pressure: it shatters without warning |
| Rivet bar | Soft wrought iron or mild steel that bends double cold without cracking |
| Tools | Rivet hearth, tongs, holding-up bar, snap (a punch with a cup to shape the head), 2–3 kg hammers, caulking tools, drill (Drills and Boring), bending rolls (Sheet Metal and Rolling) |
| Hand force pump | For the water test; small bore, a long handle, a check valve (Pumps) |
| Fittings | Bourdon pressure gauge; thick glass tube for the gauge glass (Laboratory Glassware); bronze or brass valves (Bronze, Metal Casting); tin or lead for fusible plugs |
| Brick and fireclay | To set shell boilers and line fireboxes (Bricks, Firebrick and Refractories) |
Where to find it
- Iron and fuel: see Finding and Identifying Ores, Iron (the Bloomery), Coal and Coke and Charcoal. Plate for big boilers needs a powered rolling mill — hand-hammered plate is too uneven.
- Soft water — the most important supply. Rainwater and the condensate from the engine's condenser are best. Test other water by shaking a cup with a few drops of soap solution (Soap): soft water foams at once; hard water (dissolved limestone and gypsum) makes a greasy scum first and will line your boiler with stone.
- Limestone for lime (Lime) and soda ash (Soda Ash and Baking Soda) to soften hard water; oak or chestnut tanning bark (Hides and Leather) boiled to a brown liquor, an old remedy that loosens scale.
Step by step: building a riveted boiler
The numbers below are for a vertical boiler 75 cm across and 1.8 m tall, working at 4 bar, in wrought iron — a size that drives a 3–5 horsepower engine. Scale with the formula, never by guess.
- Work out the plate. For the long seam, use a double-riveted lap joint (efficiency about 0.7) and an allowable stress of 50 MPa: thickness = 0.4 MPa × 750 mm ÷ (2 × 50 × 0.7) = 4.3 mm. Add 3 mm for corrosion over the boiler's life: use 8 mm plate. The firebox, squeezed from outside, should be at least as thick and must be stayed.
- Check the plate. A test strip from each plate must bend double cold round a bar twice its thickness without cracking. Reject plates whose edges show layers separating (laminations).
- Mark and roll. Lay out the rivet holes on the flat plate. Roll it into a cylinder in the bending rolls, with the plate's rolling direction running round the boiler (the strong direction takes the hoop stress).
- Make the holes. Rivet diameter is about 6 × √(plate thickness in mm) — for 8 mm plate, about 17–19 mm. Pitch (centre to centre) about 3 rivet diameters; distance from the plate edge to the hole centre 1.5 diameters. Drill them, or punch 3 mm small and ream to size with both plates clamped together — punching full size cracks the iron round the hole.
- Bevel the edges. Plane or chisel the outer plate's edge at about 75° so it can be caulked later.
- Bolt up the seam with temporary bolts every fourth hole. Ream misaligned holes; never force them with a drift.
- Rivet hot. Heat each rivet to bright cherry to orange (950–1,050 °C); its length is both plates plus 1.5 rivet diameters. One person presses the holding-up bar against its head; the other swells the tail with heavy, square blows to fill the hole, then forms the head with the snap — all before it drops below red. As it cools it shrinks and clamps the plates.
- Lay out the seams wisely. Stagger the long seams of neighbouring rings, and keep every seam out of the direct flame — doubled plate overheats.
- Caulk. When cold, drive the bevelled edge down against the plate beneath with a blunt caulking tool, along every seam. Caulking makes a seam tight, not strong.
- Fit the openings. Rivet a thick ring of plate round any hole bigger than a fist. Fit a manhole or mudholes (oval doors that seal from inside) for inspection and cleaning.
- Fit the stays, the fittings and the fusible plug, then water-test (next section) before the boiler ever sees a fire.
The water test (hydrostatic test)
- Fill the boiler completely with cold water, opening the top cock until water, not air, comes out. Trapped air stores energy; water does not.
- Pump with the hand force pump to the test pressure: twice the working pressure for any new or home-built boiler (8 bar for our 4-bar boiler); at least 1.5 times for later yearly tests.
- Measure the shell with a wire wrapped round its middle, before the test and after. If it does not return to its first length, the plate has yielded: rebuild that part.
- Hold the pressure for 30 minutes. Look for drips at every seam and rivet. Tap the plates with a light hammer: sound plate rings; a dull note means a hidden flaw.
- Release, caulk the leaks, and test again until it holds the pressure with no fall and no weeping.
- Paint the date, test pressure and working pressure on the boiler front.
Repeat the test every year and after any repair. Each year also empty the boiler, crawl inside with a lamp, and look for scale, pitting (small holes eaten into the plate) and grooving — a crack-like channel along the edge of a lap seam.
The fittings
Safety valves
Every boiler needs two safety valves, each big enough on its own, and at least one where no one can tamper with it.
- Lever valve. A valve on a seat, held down by a lever with a weight near its far end. The force of the steam is pressure × seat area: a 2 cm² seat (16 mm across) at 4 bar is pushed up with about 8 kg. If the valve sits 5 cm from the pivot and the weight hangs 40 cm out, the lever multiplies 8 times, so a 1 kg weight balances it (allow for the weight of the lever itself by testing). Fix the weight in place with a pin and lock — people slide weights outward "just a little".
- Spring valve. A coil spring (Springs) holds the valve down instead of a weight; it works on a moving locomotive or ship. Put a sleeve over the spring adjustment and seal it.
- Size. As a starting rule, the total seat area in cm² should be at least the steam made per hour in kg ÷ (20 × absolute pressure in bar). A boiler making 200 kg of steam an hour at 4 bar gauge (5 bar absolute) needs at least 200 ÷ 100 = 2 cm² — fit two valves of that size.
- Test it properly: the accumulation test. With the valves set, shut the main steam valve, fire the boiler as hard as you can, and watch the gauge for 15 minutes. The pressure must not climb more than 10% above the blow-off pressure. If it does, the valves are too small.
- Lift each valve by hand (an easing lever) once a day under steam, to prove it is not stuck.
Water level
- Gauge glass. A thick, guarded glass tube between a cock into the steam space and one into the water, with a drain below. Its lowest visible point must be 8–10 cm above the highest heated surface (the crown of the firebox or flue).
- Blow it through every shift: open the drain with each cock in turn; water, then steam, should rush out. A blocked cock shows a false, normal-looking level — this has killed many firemen.
- Try-cocks (see The Steam Engine) as a second, independent check.
Pressure gauge
A Bourdon gauge (Pressure and Vacuum Gauges) is a curved, flattened brass tube sealed at one end; pressure tries to straighten it, and the free end moves a pointer. Connect it through a water-filled siphon loop so live steam never reaches it. Calibrate it with a dead-weight tester: a well-fitted piston of 1 cm² in an oil-filled cylinder, connected to the gauge — each kilogram on the piston is about 1 bar.
Feed and blowdown
- Feed pump. It must deliver more water than the boiler boils at full fire, against full pressure. Drive it from the engine, with a hand pump as a spare (later, a steam injector).
- Check valve and stop valve on the feed pipe, close to the shell. Bring the feed in away from the firebox plates — cold water striking hot plate cracks it.
- Blowdown valve at the very lowest point. Open it hard for a few seconds at the start of each shift, while pressure is low, to blow out the sludge that settles there.
Water, scale and corrosion
- Scale — stone left behind as water boils off — insulates: 1 mm of it lets the plate over the fire run 50–100 °C hotter, and iron above about 400 °C loses much of its strength, bulges into a "bag" and tears.
- Soften the feed. Use rain and condensate when you can. Otherwise stir slaked lime into hard water (about 100–200 g per 1,000 litres, until a test cup no longer clouds with a pinch more), let it settle a day and draw off the clear water; a little soda ash in the boiler turns remaining scale into sludge that blowdown removes. A barrel of zeolite or greensand softens feed water more completely (Water Softening and Ion Exchange). Open and scrape out the boiler every few months on hard water.
- Corrosion. Acid or oxygen-rich water eats pits into the plate. Keep the water slightly alkaline (a little soda ash), never let it go foul, and when a boiler stands idle either drain it and dry it completely with a small fire, or fill it to the brim so there is no air.
Running a boiler safely
- Before lighting: check the water level in the glass and with the try-cocks; check the safety valves lift; open the top vent so air can escape as it warms.
- Warm it slowly. A big shell boiler takes 6–8 hours to raise steam from cold; rushing it strains seams and stays. Close the vent when steam blows from it steadily.
- Watch the water every few minutes. Never leave a boiler under fire unattended.
- Keep the level steady with small, steady feeding rather than big gulps.
- At the end of a shift, let the fire burn down, keep the water above the mark, and let the pressure fall on its own.
Danger If the water is out of sight in the glass: do not feed water, do not open the safety valve, and do not open the main steam valve suddenly. Each of these can cause a sudden surge or bring cold water onto red-hot plate. Kill the fire — cover it with damp ashes or fine wet coal, or draw it out onto the floor — close the dampers, get everyone away, and let the boiler cool for hours. Then empty it and inspect it before it is used again.
How to tell it worked
- The boiler holds twice its working pressure cold with no leaks and no permanent stretch.
- Under steam, both safety valves blow off within a few percent of the set pressure and shut cleanly ("reseat") when the pressure drops a little.
- The water in the glass moves gently and blows through cleanly from both cocks.
- The accumulation test keeps the pressure within 10% of blow-off.
- After a few months, the plate inside over the fire is clean, not crusted.
Note Troubleshooting. Rivets weep → caulk round the head cold; if the rivet itself is loose, cut it out and replace it. Water level jumps and foams; water comes out with the steam ("priming") → water too high, too dirty or oily; blow down, reduce the level, feed cleaner water. Steaming falls off week by week → scale or soot; clean the water side and sweep the tubes. Safety valve leaks below set pressure → dirt on the seat; lap the valve and seat together with fine abrasive (Abrasives and Grinding Stones). Gauge glass keeps breaking → glass not annealed, or the two cocks out of line; fit a new glass that sits loose enough to expand.
Dangers
Danger Boilers kill by five causes. Guard against all five every day.
- Low water — the most common. Hot plate uncovered, plate weakens, shell tears. Two water gauges, blown through each shift, and a fusible plug.
- Overpressure — a stuck, overloaded or tied-down safety valve. Two valves, one tamper-proof; lift by hand daily; never add weight.
- Weak metal — corrosion, grooving, cracked stays, hidden laminations. Yearly inspection inside and water test.
- Bad building or bad repair — cast iron, punched holes, a patch riveted on with no calculation, a flue left unstiffened. Build to the formula; test every repair.
- Scale and overheating — soften the water and clean the boiler.
- Scalds. Steam and boiler water strip skin. Open cocks slowly, face turned away. A glass that bursts sprays scalding water: always keep its guard on.
- Entering a boiler. Before anyone climbs inside, the boiler must be cold, drained, and cut off from any other boiler by shut and locked valves — a valve opened by someone who did not know there was a person inside has boiled many workers alive. Ventilate it; a boiler that stood shut may have no oxygen in it. Keep a second person at the manhole.
- Fumes. Carbon monoxide in a boiler house kills; fit tall chimneys (Chimneys, Stoves and Heating).
- Pressure cookers and canners are small boilers. They need a weighted vent and a second relief (a fusible plug or a rubber safety plug), a lid that cannot open under pressure, and must cool on their own before opening. See Canning and Bottling and Sterilising Instruments and Dressings for their use.
Going further
- Superheaters (tubes that heat steam beyond boiling) and economisers (pipes in the flue that warm the feedwater) save a fifth or more of the fuel (Heat Exchangers).
- Water-tube boilers at 20–100 bar drive large turbines and the Power Lines and Distribution.
- Other pressure vessels — air receivers, autoclaves, gas cylinders — and the valves that control them follow the same rules: see Pressure Vessels and Valves.
- Inspection is a social technology: explosions fell sharply wherever independent inspectors examined every boiler every year. Give one person this duty and the authority to shut a boiler down (Organising a Community).
How it was first done
Denis Papin, a French physicist working in London, built his "digester" — a pressure cooker for softening bones — in 1679, and gave it the first known lever safety valve. The early engines of Newcomen (1712) and Watt used haystack and wagon boilers at barely above air pressure.
High pressure came with Richard Trevithick in Cornwall around 1800. In 1803 one of his boilers at Greenwich exploded and killed four men; the boy minding it had left, and the safety valve had been fastened down. Trevithick responded by fitting two safety valves and the first fusible plug. His Cornish boiler (about 1812) put the fire inside a flue in the water. William Fairbairn and John Hetherington patented the two-flue Lancashire boiler in 1844, and Fairbairn founded the Manchester Steam Users' Association in 1854 to inspect boilers. Marc Seguin (1827) and the Stephensons' Rocket (1829) used many small fire-tubes; Eugène Bourdon invented his gauge in 1849; George Babcock and Stephen Wilcox patented their water-tube boiler in 1867.
The cost of learning was terrible. The Mississippi steamboat Sultana blew up in April 1865, killing about 1,200 people, after a cracked boiler was hastily patched. The Grover Shoe Factory boiler in Brockton, Massachusetts, exploded in 1905 and killed 58; that disaster led to Massachusetts' boiler laws (1907) and then to the first national American boiler code (1914). Since then, codes, tested materials and yearly inspection have made boiler explosions rare.
Source: content/entries/energy/boilers.md