Part 10 · Machines
Ion Pumps and Leak Detectors
Going below a billionth of a millimetre of mercury, where a diffusion pump's oil becomes the main dirt in the system. Pumps with no oil and no moving parts that bury gas in fresh titanium — the sputter-ion pump, the titanium sublimation pump and getter strips — together with the all-metal joints and long bakes of ultra-high vacuum, and the helium leak detector, a small mass spectrometer that finds holes too fine for any other method.
- Difficulty
- ●●●●●
- Time
- A month to build and condition a small ion pump; two to three months for a working helium leak detector; two days for each bake of an ultra-high-vacuum system
- Steps from zero
- 52 prerequisites →
This unlocks
—The full path from nothing — 52 steps before this one
- Fire
- Stone Tools
- Cordage and Rope
- Finding and Preparing Clay
- Finding and Identifying Ores
- Sulfur
- Basic Woodworking
- Hunting and Trapping
- The Kiln
- Pottery
- Charcoal
- Hides and Leather
- Lime
- Bricks
- Salt
- Mercury
- Lye and Potash
- Fermentation
- The Wheel and Axle
- Glass
- Firebrick and Refractories
- Bellows
- Saltpeter
- The Lathe
- Gears
- Copper Smelting
- Lead
- Iron (the Bloomery)
- Laboratory Glassware
- Sulfuric Acid
- Pumps
- The Waterwheel
- Lenses
- Gold and Silver
- Blacksmithing
- Nitric Acid
- Hydrochloric Acid
- The Vacuum Pump
- The Battery
- Magnets
- Silver Nitrate and Silver Salts
- The Light Bulb
- Copper Wire
- The Generator
- The Vacuum Tube
- Mirrors
- The Electric Arc Furnace
- Vacuum Coating and Thin Films
- High-Vacuum Pumps and Gauges
- Pure Silicon
- Semiconductors and the Transistor
- Hall Sensors and Magnetometers
- Ion Pumps and Leak Detectors
Do them roughly in this order. See it on the tech tree →
Why it matters
The diffusion pump and cold trap of High-Vacuum Pumps and Gauges reach about a millionth of a millimetre of mercury (10⁻⁶ mm). Below that, two things stop you. Oil vapour creeps back from the pump and coats everything. And the trap must be filled with liquid nitrogen every few hours, for ever, or the system is spoiled.
Ultra-high vacuum — below 10⁻⁸ mm — needs pumps that have no oil, no moving parts and no coolant, that can be baked hot with the rest of the system, and that will run unattended for years. These are the getter pumps: they do not push gas anywhere, they bury it in fresh metal.
Ultra-high vacuum also needs joints that do not leak at all, and the helium leak detector proves it. It also tests refrigerator pipework (Ice and Refrigeration), Pressure Vessels and Valves and cryostats (Cryogenics and Superconductors).
How it works
Pressure and surfaces
As in High-Vacuum Pumps and Gauges, pressure is given in millimetres of mercury (mm, the same as the torr). A leak rate is given in mm·litres per second (mm·L/s): a leak of 1 mm·L/s raises the pressure in a closed 1-litre box by 1 mm every second.
At these pressures the gas in the chamber hardly matters. What matters is the gas on and in the walls. A molecule striking a clean surface often sticks. The time for a clean surface to be covered by one layer of molecules is about:
| Pressure (mm) | Time to cover a clean surface |
|---|---|
| 10⁻⁶ | about 2 seconds |
| 10⁻⁸ | about 4 minutes |
| 10⁻¹⁰ | about 7 hours |
To keep a surface truly clean you need 10⁻⁹ mm or better.
The pressure a pump holds is simply the gas load divided by the pumping speed. A clean steel chamber 30 cm across has about 2,800 cm² of wall. Unbaked, after a day of pumping, steel gives off roughly 10⁻⁹ mm·L/s from each cm² — about 3 × 10⁻⁶ in all. A 100 L/s pump then holds 3 × 10⁻⁸ mm. Baked, the same steel gives off about a thousandth as much, and the same pump holds 3 × 10⁻¹¹ mm. Baking, not a bigger pump, is what makes ultra-high vacuum.
Getters
A freshly made film of a reactive metal — titanium, zirconium, barium — reacts with almost any active gas that touches it: oxygen, nitrogen, water, carbon monoxide and dioxide. The gas is held as a solid oxide, nitride or carbide. Hydrogen instead dissolves into the titanium. Noble gases — helium, argon — and methane do not react at all.
A getter is used up as its surface fills; a fresh film pumps again. The pumping speed of a fresh titanium film at room temperature is about 3 L/s per cm² for hydrogen, 4–5 for nitrogen and 8–9 for carbon monoxide, oxygen and water. Cooled with liquid nitrogen, it roughly doubles for hydrogen.
The Penning cell
Hold an open metal tube several thousand volts positive, with an earthed plate across each end and a magnetic field along its axis. An electron inside cannot reach the tube, because the field curls its path into a tight spiral, nor the plates, which repel it. Trapped, it travels a very long path until it knocks an electron off a gas molecule. The new electron is trapped too, so a cloud builds up and stays even at 10⁻¹¹ mm. This is the cold-cathode Penning gauge of High-Vacuum Pumps and Gauges.
The positive ion is heavy and is hardly bent. It shoots into a plate at several thousand volts. Two things then happen:
- The ion splashes titanium out of the plate — the same sputtering used in the sputter coater. The titanium lands on the tube walls and the opposite plate as a fresh getter film that swallows active gases.
- The ion itself is buried in the plate, a few atomic layers deep. That is the only way noble gases are pumped.
Make many such cells side by side and you have a sputter-ion pump. Its current is proportional to the pressure, so the pump is its own gauge.
The mass spectrometer
Speed an ion through a voltage V and send it into a magnetic field B: it moves in a circle whose radius depends on its mass. Heavier ions swing in wider circles. For singly charged ions:
radius in cm ≈ 144 × √(mass × V) ÷ B, with mass in atomic units (hydrogen 1, helium 4), V in volts and B in gauss (10,000 gauss = 1 tesla).
At 200 V and 1,000 gauss, helium ions (mass 4) circle at a radius of 4.1 cm, hydrogen molecules (mass 2) at 2.9 cm and the stray mass-3 ions at 3.5 cm. After half a circle, helium lands about a centimetre away from its nearest neighbour. A slit there lets helium through and nothing else. That is all a helium leak detector is.
What you need
| Item | Use | Source |
|---|---|---|
| Austenitic stainless steel sheet and tube (not magnetic) | Pump bodies, flanges, anode cells | Alloy and Stainless Steels, Welding |
| Titanium plate 1–2 mm, titanium wire | Cathodes, sublimation filaments | Titanium |
| Molybdenum or tungsten wire | Filament cores, heaters | Tungsten and Filament Wire, Molybdenum |
| Ferrite or alnico magnet blocks, soft-iron sheet | Magnet for ion pump and spectrometer | Permanent Magnets |
| Hall-plate gaussmeter or fluxgate | Measuring the field | Hall Sensors and Magnetometers |
| Fired alumina or steatite insulators; glass-to-metal seals | Mounting electrodes, feedthroughs | Firebrick and Refractories, Scientific Glassblowing and Glass-to-Metal Seals |
| Oxygen-free copper | Gaskets | Copper Smelting |
| 5–7 kV DC supply with current limit | Ion pump | Power Supplies and Regulators, Rectifiers: Turning AC into DC |
| Electrometer amplifier | Spectrometer ion current | Amplifiers and Oscillators |
| Helium, with a fine spray nozzle | Leak testing | Natural Gas and Helium |
| A diffusion-pumped bench with sorption pumps | Everything | High-Vacuum Pumps and Gauges |
Where to find it
- Titanium comes from ilmenite and rutile, the black, heavy grains in beach and river sands (Titanium). The metal is very hard to make; a sputter-ion pump needs only a few hundred grams.
- Helium is frozen out of certain natural gases that carry from 0.3 % to several percent of it (Natural Gas and Helium), or collected as the gas that never liquefies at the top of an air-separation column (Liquid Air, Nitrogen and the Noble Gases). Uranium and thorium minerals give off a little when heated or dissolved in acid, which is how it was first collected on Earth.
- Magnets. Ferrite blocks are made from iron oxide with barium or strontium carbonate (Permanent Magnets).
The sputter-ion pump
Sizes for a small pump (about 20 L/s)
| Part | Size |
|---|---|
| Body | Flat box of non-magnetic stainless steel, inside about 12 × 12 × 4 cm, walls 2 mm, with a 40 mm pumping neck and flange |
| Anode | A honeycomb of 16 tubes, each 18 mm across and 20 mm long, of 0.3 mm stainless sheet, spot-welded together |
| Cathodes | Two titanium plates 1.5–2 mm thick, each covering the whole honeycomb, 5–6 mm from its ends |
| Magnetic field | 1,000–1,500 gauss (0.10–0.15 T) along the tubes |
| Voltage | Anode +5,000 V; cathodes and body at earth |
| Speed | About 1 L/s per cell for air |
Making it
- Body. Fold and weld the box from the inside, so no crevice faces the vacuum (Welding). Weld on the neck and a high-voltage feedthrough port. Every joint must hold helium (below).
- Anode. Roll the tubes on a mandrel, spot-weld their seams, then spot-weld them into a square block. Mount it on two or three fired alumina or steatite insulators so it is centred between the plates.
- Cathodes. Cut, flatten and scrub the titanium plates. Fix them to the box walls with stainless screws and vented spacers, so no gas is trapped behind them. They are at earth with the box.
- Feedthrough. A glass-to-metal or ceramic-to-metal seal carrying one stiff wire to the anode, tested to 10 kV, with a smooth rounded outer terminal and an insulating cap (Scientific Glassblowing and Glass-to-Metal Seals).
- Magnet. Clamp ferrite or alnico blocks against both broad faces of the box, outside the vacuum. Join their outer faces with a C-shaped soft-iron yoke so the field goes round through iron instead of leaking into the air. Measure the field at the centre of the honeycomb with a Hall probe (Hall Sensors and Magnetometers): below about 800 gauss the pump struggles at low pressure.
- Supply. 5 kV DC from a transformer, rectifier and capacitor, with a series resistor or a deliberately weak transformer so it can give no more than a few tens of milliamperes even when shorted (Power Supplies and Regulators). A microammeter in the earth return is your pressure gauge.
- Clean and bake. Degrease every part, assemble with gloves, and bake the bare pump at 300–350 °C for a day on a diffusion pump. Take the magnets off for the bake, or the ferrite loses some strength.
Starting and running it
- Rough the system below 10⁻⁴ mm if you can — sorption pumps keep it oil-free (High-Vacuum Pumps and Gauges). Close the valve to the roughing pumps.
- Switch on. A blue-violet glow and tens of milliamperes mean it is starting; it heats and the voltage sags. Let the current limit do its job.
- Within 10 minutes to an hour the current falls, the glow vanishes and the voltage climbs to full: the pump has taken over.
- From then on, current tells pressure: roughly a few milliamperes at 10⁻⁵ mm for a pump this size (each pump differs; calibrate it once against an ion gauge), falling tenfold for each tenfold fall in pressure, down to a floor of a fraction of a microampere set by leakage over the insulators.
Life. Sputtering wears grooves in the cathodes opposite each cell. At 10⁻⁶ mm they last about five years of continuous running; at 10⁻⁹ mm they outlive you. Never run it for long above 10⁻⁵ mm.
Good and bad
- Gases. A plain pump like this one (a diode pump) pumps hydrogen about twice as fast as air, helium at a tenth, argon at about a hundredth.
- Argon instability. Air is nearly 1 % argon. A diode pump buries argon shallowly, and later sputtering digs it up again: the pressure rises in sudden bursts every few minutes. Cures: make one cathode of tantalum instead of titanium (heavier atoms bounce argon back hard into the walls, where it stays buried), or use slotted cathodes as grids with the box as a third electrode (the triode pump).
- Field emission. Sharp edges or titanium flakes on the anode emit electrons at high voltage, so the current never falls. Round every edge; run the pump for a few minutes at 7–8 kV while pumped hard to burn whiskers off.
- Stray field. Keep the magnet a metre from electron guns, or shield it with soft iron.
The titanium sublimation pump
An ion pump is slow on a big gas load. The titanium sublimation pump is fast and cheap: titanium boiled off a hot filament coats a large cooled wall, which then pumps every active gas at its full surface speed.
- Filaments. Pure titanium sags near its melting point (1,668 °C). Use an alloy of about 85 % titanium and 15 % molybdenum, drawn to wire 1.5–2 mm thick and 15–20 cm long, bent into a loose hairpin; or wind titanium wire tightly round a 1 mm molybdenum or tungsten core, which carries the current and stays stiff. Mount three or four on a feedthrough flange, so a spent one can be swapped by turning a switch.
- Heat. A low-voltage transformer giving 40–50 A at 5–7 V. The filament glows yellow-white, about 1,500 °C. Titanium leaves its surface as vapour.
- Shroud. The titanium must land on a large, cool surface that faces the filament: a cylinder or the chamber wall around it, 1,000–2,000 cm², water-cooled through a soldered copper coil, or a re-entrant can filled with liquid nitrogen. Shield windows, insulators and anything the vapour must not coat. 1,000 cm² of fresh film pumps about 4,000 L/s of air — forty times the ion pump.
- Flash, don't run. Heat a filament for 1–2 minutes, then switch off. The film pumps until its surface is full. At 10⁻⁶ mm flash every few minutes; at 10⁻⁹ mm, once every few hours; at 10⁻¹⁰ mm, once a day.
Each filament carries about a gram of titanium, enough for months of use in a clean system. It pumps no noble gases or methane, so always pair it with an ion pump.
Getter strips and pumps
A non-evaporable getter pumps without making a film. Zirconium alloyed with about a sixth of its weight of aluminium, crushed and pressed as powder onto a nickel-plated steel ribbon, has a huge rough surface (Zircon and Zirconium). Heated to about 750 °C for half an hour under vacuum, its surface oxide soaks inward and leaves bare metal. Cooled, it pumps active gases and, above all, hydrogen. Coil a few metres of strip inside a chamber, or behind a slotted shield as a getter pump, and reactivate it by heating when it slows. Small pellets of the same alloy keep sealed tubes hard for decades (The Vacuum Tube).
Ultra-high-vacuum practice
Everything in High-Vacuum Pumps and Gauges about clean metal, inside welds and vented screws applies, more strictly.
No rubber, no grease, no oil. Every O-ring is replaced by a metal seal, every valve by an all-metal valve, and the oil pumps by sorption roughing and getter pumping.
The knife-edge flange
Two thick stainless flanges each have a ring-shaped knife edge, set in a shallow recess. Between them goes a flat ring of annealed oxygen-free copper 2 mm thick. Tightening the bolts drives both edges into the copper, which flows into every scratch and is held in by the recess walls.
- Turn the knife edges on the The Lathe in one setting with a sharp tool; never touch them with anything harder than a fingertip in a glove.
- Use a new gasket every time. Copper is cheap; leaks are not.
- Tighten each bolt a quarter-turn at a time, in a star order, until the flange faces almost meet, with an even gap all round.
- Coat the bolt threads with a little molybdenum disulfide or silver-plate them, so they do not seize after baking.
Such joints stand baking to 450 °C and leak less than 10⁻¹¹ mm·L/s.
Baking
- Wrap the whole system in heating tape, or build an oven of firebrick and sheet steel round it, and cover it with aluminium foil to even out the heat. Cold spots collect water and spoil the bake.
- Raise the temperature by about 50 °C an hour to protect glass windows and feedthroughs, and hold 200–250 °C for 24–48 hours with the ion pump running. Glass and ceramic windows limit the temperature; remove magnets that cannot take it.
- Near the end, while still hot, degas every filament and gauge by running it hot, and flash the sublimation pump.
- Cool slowly. Flash the sublimation pump again when cold. The pressure falls a hundredfold or more as the walls cool: 10⁻⁹ to 10⁻¹⁰ mm from a good system.
Vacuum firing. Stainless steel holds hydrogen from its making. Heating parts to about 950 °C in a vacuum furnace for a few hours before assembly (Electric Kilns and Furnaces) drives it out and lowers the final pressure another tenfold.
The helium leak detector
Why helium. It is rare in air (5 parts in a million), light enough to pass the finest leak, inert, not soaked up by oil or walls — and nothing else in a vacuum system weighs 4.
Building the spectrometer tube
- Ion source. A small box with a hairpin tungsten filament on one side and a positive collector plate opposite, about 2 cm apart. Electrons of 50–100 volts cross the box and ionise the gas there. A small magnet along the electron path makes them spiral and raises the yield.
- Accelerating slits. The box is held at +200 V above earth. Ions leave through a slit 1 mm wide, 8 mm long in its floor and are speeded towards an earthed second slit 3–5 mm below.
- Analyser. A flat, non-magnetic box, 2 cm thick, lying between the poles of a magnet giving 1,000 gauss (0.1 T) across it. The ions swing through half a circle of 4.1 cm radius — so the exit slit sits 8.2 cm from the entrance slit, on the same line. A baffle across the middle stops gas and stray ions taking a short cut.
- Collector. A small metal cup behind a 1 mm exit slit, on a glass-insulated lead to an electrometer amplifier with a 10¹⁰–10¹¹ ohm input resistor (Amplifiers and Oscillators). The helium ion current is a millionth of a millionth of an ampere or less.
- Pump. A 5 cm diffusion pump with a liquid-nitrogen trap holds the tube below 10⁻⁵ mm; the filament dies above 10⁻⁴.
Tuning
Let a little helium in through a leaky valve and slowly raise the accelerating voltage from 150 V. Peaks appear one after another — mass 4 at 200 V, mass 3 at about 267 V, mass 2 at 400 V, because lighter ions need more voltage for the same radius. The one that jumps when helium is sprayed is helium. Set the voltage on its top. Check daily: field and filament drift.
The calibrated leak
Blow a thin-walled bulb of hard borosilicate glass, fill it with helium at atmospheric pressure, and seal it to a small steel reservoir with a valve. Helium slowly soaks through hot or thin glass, and almost nothing else does. A bulb like this leaks a steady 10⁻⁸ to 10⁻⁷ mm·L/s, changing about 3 % for each degree of temperature. Measure its rate once, by letting it leak for a known time into a sealed, known volume read on a McLeod gauge, and label it.
Using it
- Connect the test piece to the detector's inlet valve, pump it out with its own roughing pump, then open it to the detector.
- Counterflow. Join the test piece not to the spectrometer but to the outlet of the detector's diffusion pump. A diffusion pump stops heavy gases well but helium poorly, so helium alone diffuses backwards up through it into the tube. The test piece can then be at 0.1 mm instead of 10⁻⁵ mm, and dirty work never fouls the spectrometer.
- Spray a fine jet of helium from a nozzle at one joint at a time, moving about 1–2 cm a second. Start at the top: helium rises and drifts round a system. When the meter jumps, go back slowly and narrow the jet until you find the point.
- Bagging and sniffing. For the total leak of a part, tie a bag of helium round it. To test something under pressure — a refrigerator coil, a tank — fill it with helium and draw air from round each joint through a fine probe into the detector.
- Read the leak rate against the calibrated leak.
A good detector finds 10⁻¹⁰ mm·L/s — a leak through which a thimbleful of air would take some two hundred years to pass. A system for 10⁻¹⁰ mm wants no single leak above 10⁻¹¹ mm·L/s.
Without helium, tune the same tube to mass 2 and spray hydrogen; the background is higher.
How to tell it worked
- The ion pump's current falls steadily after starting and settles at a few microamperes; closing the valve to every other pump, the pressure holds.
- Flashing the sublimation pump makes the ion gauge reading drop sharply within seconds.
- After a bake, a system of steel and copper reaches below 10⁻⁹ mm and stays there for weeks with the pumps' power as the only attention.
- The leak detector shows a sharp helium peak, finds the calibrated leak every time, and finds nothing on a sound weld.
Note Troubleshooting. Ion pump will not take over; glow never stops → starting pressure too high, a real leak, or a weak current limit letting it overheat. Rough lower; leak-test. Pressure rises in bursts every few minutes → argon instability; fit a tantalum cathode or use a triode pump. Current stays high in a good vacuum → field emission; condition at higher voltage, clean the anode. Sublimation pump makes no difference → the film is landing on a warm surface or out of sight of the chamber; cool and enlarge the shroud. Pressure stalls at 10⁻⁸ mm after baking → a cold spot during the bake, a rubber seal somewhere, or hydrogen from unfired steel. Leak detector peak drifts or is noisy → filament ageing, magnet field changing with temperature, or the electrometer lead picking up vibration; shield it and fix it rigidly.
Dangers
Danger Ion-pump supplies carry 5–7 kV and can kill. Even a current limit of tens of milliamperes is enough to stop a heart; the limit protects the pump, not you. The pump keeps its charge in its cables after switch-off. Use a supply that cannot give more than tens of milliamperes, earth the body solidly, discharge the anode lead with an earthed rod before touching it, and never connect or disconnect the cable with the supply on (Wiring and Electrical Safety).
- Sublimation filaments carry 50 A: thick cables, tight joints. A loose joint glows red.
- Hot titanium film with a big burst of air can burn. Let the sublimation pump cool before letting air in.
- Baking: heating tapes reach 300 °C and start fires on wood and paper; flanges stay hot for hours.
- Implosion of glass windows, liquid nitrogen and oxygen-in-trap hazards are as in High-Vacuum Pumps and Gauges.
- Helium in large amounts in a small room displaces air and suffocates without warning. Spray only what you need, ventilate.
- Strong magnets pinch fingers between blocks and wipe magnetic records; keep watches and steel tools away.
What this unlocks
Field-emission guns for the The Electron Microscope; beam pipes for Particle Accelerators (Overview); Atomic Clocks (Overview); clean surfaces for Vacuum Coating and Thin Films and Making Microchips; space-simulation chambers for Spaceflight and Spacecraft. The leak detector's spectrometer is the seed of the general mass spectrometer of Analytical Instruments.
How it was first done
Arturo Malignani in Italy used red phosphorus as a getter in light bulbs in 1894, and flashed barium getters followed for radio valves. Frans Penning built his cold-cathode gauge in 1937 and noticed that it pumped. In 1957–58 Lewis Hall, John Helmer and Robert Jepsen at Varian Associates in California turned the Penning cell into the multi-cell VacIon sputter-ion pump, and Varian's William Wheeler and Maurice Carlson introduced the knife-edge copper-gasket flange around 1961. Titanium sublimation pumps came into use in the early 1960s, and zirconium-aluminium getter strips in Italy in the late 1960s. The helium leak detector was developed during the Second World War, largely by Alfred Nier at the University of Minnesota, to keep the miles of pipework of the American uranium-separation plants tight; its design followed Arthur Dempster's 180° magnetic mass spectrometer of 1918.
Source: content/entries/mechanics/ion-pumps-and-leak-detectors.md