Part 6 · Building
Cranes and Lifting
How a few people can safely lift stones, beams, bells and engines weighing tonnes — with gin poles, shear legs, treadwheel cranes, winches, block and tackle and jacks — and how to anchor, rig, sling and test them so nothing falls on anyone.
- Difficulty
- ●●●●●
- Time
- A day to raise shear legs; a few weeks to build a treadwheel crane
- Steps from zero
- 5 prerequisites →
This unlocks
Steel Frames and Tall BuildingsLifts, Hoists and Mine WindingMoving Goods: Pallet Trucks, Forklifts and ContainersThe full path from nothing — 5 steps before this one
- Stone Tools
- Simple Machines
- Basic Woodworking
- The Wheel and Axle
- Gears
- Cranes and Lifting
Do them roughly in this order. See it on the tech tree →
Why it matters
The size of what you can build is set by the weight you can lift. Without lifting gear, walls stop at head height, beams are as heavy as two people can carry, and a millstone, a bell or a boiler is impossible to move. With a pair of poles, a good rope and a set of pulley blocks, three people can raise a tonne; with a treadwheel crane, one person can lift a stone block onto the top of a cathedral wall.
Lifting gear is also the most dangerous equipment in this book to use carelessly. Ropes snap, poles buckle, anchors pull out of the ground, and the load falls. This chapter is as much about doing it safely as about doing it at all.
How it works
Every lifting machine trades distance for force: you pull a long way with a small force to move the load a short way with a large one. The mechanical advantage (MA) of each simple machine is explained in Simple Machines; here they are combined.
Advantages multiply. A treadwheel 4 m across turning a drum 50 cm across gives MA 8. Hang a block and tackle with 4 supporting strands from the crane's rope and the total is 8 × 4 = 32: one person's push of 30 kg could, before friction, hold almost a tonne. Gears multiply too (Gears): a crank winch with 5 : 1 gearing and a crank five times the drum radius gives 25.
Friction takes its share. Each wooden pulley the rope passes over loses about a tenth of the force, and every bearing more. Expect to get about two-thirds of the theoretical advantage from a well-greased wooden rig.
Every part carries the full load somewhere. The rope, each block's hook and pin, the pole or jib, the lashing, the guys and the anchors in the ground all carry forces as large as the load or larger. A rig is as strong as its weakest part — usually a rope, a lashing or an anchor.
What you need
| Item | Size and notes | See |
|---|---|---|
| Poles | Straight, sound, seasoned: 6–9 m long, 15–25 cm thick at the small end | Timber Framing and Log Building |
| Rope | Hemp or other strong fibre, 12–32 mm thick | Cordage and Rope, Flax, Hemp and Linen |
| Blocks | Hardwood shells with sheaves at least 8× the rope thickness, greased iron pins | Simple Machines |
| Pickets | Hardwood stakes 1.2–1.5 m long, 8–10 cm thick | |
| Deadman logs | 2–3 m long, 25–30 cm thick, for heavy anchors | |
| Winch | Crank windlass or geared crab with a pawl | Gears |
| Rollers, skids, sledge | Hardwood logs 10–15 cm thick; squared timbers | |
| Packing timber | Short squared blocks for cribbing | |
| Iron | Hooks, shackles, pins, crowbars | Blacksmithing |
Where to find it
- Poles: young conifers grown straight in dense stands (spruce, larch, fir, pine) make light, long poles; ash and oak make heavier, stronger ones. Cut in winter, peel, and season under cover for a year. Reject any pole with a large knot, a split, a twist in the grain, or soft or punky wood — tap it along its length with a hammer; sound wood rings, rot sounds dull.
- Rope fibre: hemp, flax, sisal, coir, lime bast. See Cordage and Rope and Flax, Hemp and Linen.
- Block wood: elm (it does not split), hornbeam, apple, oak.
Rope, knots and anchors
How much a rope can safely lift
A rough rule for sound, new, three-strand hemp rope of good quality:
Safe working load (kg) ≈ (thickness in mm)²
| Rope thickness | Safe working load |
|---|---|
| 12 mm | about 150 kg |
| 20 mm | about 400 kg |
| 25 mm | about 600 kg |
| 32 mm | about 1,000 kg |
Good rope of this kind breaks at roughly six times these loads; that margin is your safety factor. Halve it for old, wet, frayed or home-made rope of unknown strength, and for any rope with a knot in it (a knot weakens a rope by a third to a half; see Knots, Lashings and Rigging). If in doubt, test: hang a load of three times the intended working load on a short sample and leave it for an hour. Rot, mildew, acid and sharp edges destroy rope; keep it dry and coiled, and look along every metre before each lift.
Knots
Learn these until you can tie them in the dark (Cordage and Rope):
- Bowline — a loop that does not slip or jam; for tying a rope round a person or to a ring.
- Round turn and two half hitches — tying a guy to a picket or a ring.
- Clove hitch — starting and finishing a lashing.
- Timber hitch — gripping a log or pole to drag it.
Anchors
A crane is only as good as the anchors holding its guys.
- Picket holdfast. Drive a hardwood picket 1 m into firm ground, sloping away from the pull at about 15–20°. One picket holds a few hundred kilograms. For more, set three in a row along the line of pull, 1 m apart, and lash the head of each to the foot of the one behind it with several turns of rope, twisted tight with a stick. Three pickets in a row (a "1-1-1") hold only about 800 kg in firm soil. For more, drive three pickets side by side at the front, lashed to two behind, lashed to one at the back (a "3-2-1"): about 1.8 tonnes. In soft or wet ground, expect much less.
- Deadman. For the heaviest loads, dig a trench 1–1.5 m deep at right angles to the pull, lay a log in it, tie the guy round the log's middle, cut a sloping slot for the rope to come up through, and fill and ram the trench. A buried log 2–3 m long holds several tonnes in firm ground.
- Natural anchors: a big living tree (tie low on the trunk, padded) or a large rock outcrop.
Method 1: The gin pole and the tripod
The gin pole is a single upright pole with a block at its head, held by four guys spread at right angles to each other. Anchor each guy at least twice the pole's height from its foot. The pole may lean slightly toward the load (no more than 1 in 6), so the load hangs clear. It is the easiest lifting rig to set up and move, and is ideal for raising timber frames (Timber Framing and Log Building) and other poles.
The tripod is three poles lashed together near their tops and spread so the feet form a triangle with sides of about half the leg length. It needs no guys at all and is the steadiest rig for a straight vertical lift — over a well (Wells and Cisterns), a pit, or an engine being set on its bed. Its weakness is that it can only lift straight up and down within its feet.
Method 2: Shear legs
Shear legs (sheers) lift heavy loads and can swing them a little forward and back by easing the back guy.
- Choose the poles. As a rough starting point for sound, straight softwood: legs 6 m long and 15 cm thick at the small end for loads up to 1 tonne; 8 m and 20 cm for 2–3 tonnes. Longer legs need to be thicker. Prove every rig with a test load (below).
- Lay them side by side, butts level, and cross the tops so they overlap by about 60 cm. Put a block of wood between them at the crossing so the lashing grips.
- Lash them. Clove hitch round one leg, then 8–10 tight figure-of-eight turns round both legs, then 2–3 frapping turns round the lashing between the legs to tighten it, and finish with a clove hitch. Use rope at least as thick as the tackle fall.
- Hang the tackle with a sling over the crossing — never on the lashing alone — and tie on the back guy and fore guy, each with a round turn and two half hitches above the crossing.
- Raise them. Set the feet against stakes or in shallow pits. Lift the heads by hand and push up on props while a team (or a second winch) hauls on the back guy from its anchor. Spread the feet to about a third of the leg length and tie them together with a rope or a spreader pole so they cannot slide apart. Set them on planks if the ground is soft.
- Set the lean. The legs should lean toward the load by no more than 1 in 4 of their height. More lean means much more pull on the back guy and a risk that the whole rig tips over.
- Lead the fall down one leg, through a snatch block (a block that opens at the side to take the rope) tied at the foot, and away to the winch or the haulers.
Method 3: The treadwheel crane
For lifting all day at one place — a building site, a quay, a mine shaft — the treadwheel is the best human-powered machine ever made. Legs push harder and longer than arms, and a person climbing steadily inside a wheel can work for hours.
- The axle: a squared oak log 30–40 cm thick and 2–3 m long, rounded at the ends where it turns in greased hardwood or Bronze bearings on two A-frame trestles (Bearings and Lubrication). The rope winds on the middle, which acts as the drum, about 50 cm across.
- The wheel: two rims about 4 m across, built of curved planks in two layers pegged with joints crossing, each fixed to the axle by 8 spokes mortised through it. Join the rims with boards nailed across their inside, about 1 m wide, as a walking floor; fix a cleat across every board so feet cannot slip.
- The jib or mast: a strong upright pole set in a framed base, with an arm reaching out over the load, braced by a diagonal strut, and pulleys at the top to lead the rope from the drum out over the load.
- The brake: a stout lever with a hardwood shoe that presses on the outside of the rim, and a pawl dropping into notches or pegs round the rim, so the load cannot run back. Someone must stand at the brake at all times, and the walker must know how to step out sideways.
With MA 8 and friction, a walker of 70 kg can raise roughly 300–500 kg directly, and much more with a block and tackle on the hook. Two wheels on one axle, or two walkers in one wide wheel, double it.
Method 4: Winches and jacks
The crab winch. A drum 15–20 cm across, turned through a pair of gears (Gears) by a crank on each side. With a crank 40 cm long, a 12-tooth pinion driving a 60-tooth wheel, and a 20 cm drum, MA = (40 ÷ 10) × 5 = 20. Fit a ratchet and pawl, and a band brake for lowering. Bolt or lash it to a heavy timber base and anchor that to a deadman.
The capstan: a vertical drum turned by bars pushed by several people or by animals (Draft Animals and Harness); good for long horizontal pulls such as dragging a boat up a beach or a building along rollers.
Jacks lift a little way with great force:
- Lever and cribbing. Lever one end of the load up a few centimetres with a long iron bar or wooden pole, slide packing timbers under it, lower onto them, and repeat at the other end. Build the packing as a crib — layers of short timbers laid alternately at right angles, like a log cabin ("pigsty"). In this way a tonne-weight block can be raised a metre in a day by two people with nothing else, and it is never held up by the lever alone.
- The screw jack: a strong iron screw (Screws, Nuts and Bolts) in a heavy nut, turned by a bar. A 1 cm pitch and a 60 cm bar give a theoretical advantage of nearly 400; friction leaves perhaps 100. A screw jack holds its load by itself when you stop turning.
- The hydraulic jack: see Hydraulic Presses and Rams.
Moving loads along the ground
Lifting is only half the work (for stores and docks, see Moving Goods: Pallet Trucks, Forklifts and Containers). Drag the load on a sledge over greased or wetted timber skids, or roll it on rollers — hardwood logs 10–15 cm thick, all the same size, with a person moving each roller from the back to the front as the load passes. Steer by angling the front rollers. Up a slope, use a ramp no steeper than 1 in 10 and haul with a winch or tackle anchored ahead, with a second rope from behind to check it. See Simple Machines for worked examples.
Slinging the load
- Find the centre of gravity and hang the hook directly above it, or the load will tip when it leaves the ground.
- Keep sling angles narrow. Keep the angle between the legs under 90°.
- Pad sharp corners with sacking, leather or split wood. A sharp stone edge cuts rope under load.
- Lift 5–10 cm and stop. Check that the load hangs level, the rig is steady and the anchors are holding, before going higher.
- Tag lines: tie a light rope to each end of a long load so helpers can steady it from a distance without standing under it.
- One person gives signals, and everyone knows them: arm raised and circling = hoist; arm down and circling = lower; fist clenched or both arms out = stop. Anyone may call stop.
How to tell it worked
Proof test every new rig before real use: lift a load of 1¼ to 1½ times the heaviest working load just 5–10 cm off the ground and hold it for 10 minutes. Watch:
- The poles stay straight; no creaking or cracking.
- The lashing does not slip down the poles.
- The pickets do not move. Mark the ground at each one before the test.
- Ropes do not stretch further after the first minute.
If all hold, the rig is good for the working load. Re-test after any repair or after moving it.
Note Troubleshooting. Pickets pull out or lean → soil too soft or pull too steep. Add more pickets in the row, or use a deadman; anchor further away so the guy pulls more horizontally. Shear legs creep forward → too much lean or the back guy stretched. Reduce the lean and re-tension the back guy before every lift. Feet of the legs slide apart → tie them together and seat them in pits. Tackle jams or twists → the blocks are turning on the rope; separate them, untwist, and fix the lower block from spinning with a tag line. Treadwheel runs backwards when the walker stops → pawl not engaging. Fix it before any more lifting. Load swings when lifted → hook not over the centre of gravity, or rig leaning. Lower and re-sling.
Dangers
Danger Never stand or walk under a load, and never put any part of your body under it. Ropes break without warning, and a falling tonne kills. Keep everyone not needed out of the area under the load and inside the reach of the poles if they fall. When a load must be positioned by hand, lower it onto packing blocks first and move it with bars, never with fingers underneath.
Danger A runaway treadwheel or winch kills. If the brake or pawl fails, the load falls, the wheel or crank spins backwards at great speed, and the walker can be flung or the crank can break an arm or a skull. Always have a pawl engaged and a person on the brake; never let go of a crank handle without the pawl set.
- Guys and anchors. If an anchor fails the whole rig falls sideways. Never stand in line with a loaded rope or guy: if it parts, the ends whip back with killing force.
- Hands in the tackle. Fingers drawn into a sheave with the rope are crushed. Keep hands at least an arm's length from any block when hauling.
- Overhead lines. Keep poles and jibs well clear of any overhead power line.
- Rotten gear. Inspect every rope and pole before every lift. Throw away doubtful rope; it is cheaper than a funeral.
What this unlocks
Lifting gear raises the walls of Stone Masonry and Timber Framing and Log Building, the vaults of Arches, Vaults and Domes, bridge spans (Roads and Bridges), mill machinery (The Watermill), bells, boilers (The Steam Engine) and ships' masts (Boats and Sails). Driven by steam or by Hydraulic Presses and Rams, with Wire Rope and Cable in place of hemp, it becomes the dock crane and the mine hoist (Mining and Tunnelling, Lifts, Hoists and Mine Winding). Climbing derricks and tower cranes build Steel Frames and Tall Buildings, and the same rope, drum and brake, closed in a shaft, become the lift (elevator, see Lifts, Hoists and Mine Winding).
How it was first done
People moved huge stones long before cranes. The builders of Stonehenge and of Egypt's pyramids used sledges, levers, ramps and great crews; a wall painting from Egypt shows a statue on a sledge with a man pouring water in front of it, and experiments in 2014 showed that wetting sand roughly halves the force needed to drag a sledge across it. The Greeks seem to have invented the crane in the late 6th century BC: from that time, building blocks start to show cuttings for lifting tongs and hooks instead of the ramps used before. Roman engineers described cranes with compound pulleys — the trispastos (three pulleys), pentaspastos (five) and polyspastos (many) — and a treadwheel-driven polyspastos could lift several tonnes.
Medieval Europe built its cathedrals with treadwheel cranes, and a few survive in church roofs, such as at Salisbury and Canterbury; port cities had great wooden harbour cranes for unloading ships. Filippo Brunelleschi designed an ox-powered hoist with a reversing gear to raise the stone for the dome of Florence cathedral in the 1420s. In 1586 Domenico Fontana moved the 330-tonne Vatican obelisk to the square of St Peter's using some 40 capstans, about 900 men and 75 horses. William Armstrong's hydraulic crane (1846) at Newcastle, England, began the age of powered cranes.