Scaffolding and Ladders
How to make ladders that do not break or slip, lash poles together into a scaffold that lets several people work safely high on a wall, carry its working floor on putlogs, and stop falls — and what to do when someone does fall or is left hanging.
- Difficulty
- ●●●●●
- Time
- Half a day for a ladder; a day or two for a small scaffold with a team of four
- Steps from zero
- 15 prerequisites →
This unlocks
—The full path from nothing — 15 steps before this one
- Stone Tools
- Fire
- Cordage and Rope
- Finding and Preparing Clay
- Finding and Identifying Ores
- Basic Woodworking
- Hunting and Trapping
- Charcoal
- Hides and Leather
- Bellows
- Iron (the Bloomery)
- Blacksmithing
- Steel
- Axes, Chisels, Knives and Planes
- Timber Framing and Log Building
- Scaffolding and Ladders
Do them roughly in this order. See it on the tech tree →
Why it matters
Every building taller than a person must be built by people standing somewhere above the ground. A wall goes up only as high as the mason can reach; a roof is thatched, tiled or repaired only if someone can get onto it. Ladders let one person climb; scaffolds give a whole team a steady floor at height, with room for tools, mortar and stone. With them you can build two-storey houses, chimneys, church towers, Arches, Vaults and Domes, mills and water towers.
Falls are also the commonest way builders die. A fall from just 2 metres — head height — onto hard ground can break a skull or a spine. This chapter is about building access and about not falling.
How it works
Poles fail by bending sideways. A long, thin pole squeezed from its ends (a standard — an upright of a scaffold — or a ladder's side) does not crush; it bows out and snaps. The longer and thinner it is, the less it carries. That is why scaffolds have horizontal poles tying the uprights together every 1.5–2 m: each short length between ties is far stronger than one long one.
A frame of rectangles folds flat. Poles lashed in squares can lean and collapse sideways like a pack of cards. Only triangles are rigid. Every scaffold needs diagonal braces, and should be tied to the building so it cannot lean away.
Lashings hold by friction. A lashed joint holds because the rope squeezes one pole hard against the other. Wet rope swells and dry rope shrinks and loosens; new natural rope stretches. Lashings must be checked and re-tightened.
A ladder is stable only at the right angle. Too steep and it tips backward when you lean out; too shallow and its foot slides out. The safe angle is about 75°: the foot stands out 1 unit for every 4 units of height.
What you need
| Item | Size | Notes |
|---|---|---|
| Standards (uprights) | 10–15 cm thick at the butt, 6–10 m long | Straight, sound conifer poles or bamboo |
| Ledgers (horizontals along the wall) | 7–10 cm thick, 4–6 m long | Lashed to the standards |
| Putlogs (short cross-poles under the floor) | 7–10 cm thick, 1.5–2 m long | Hardwood if possible; they carry the boards |
| Braces | 7–10 cm, long enough to cross two or three lifts | Any straight pole |
| Boards | 4–5 cm thick, 20–25 cm wide, 2–4 m long | Split or sawn softwood, free of large knots |
| Lashing rope | 10–12 mm hemp or other strong rope, 6–10 m per joint | Cordage and Rope, Ropewalks and Sailcloth |
| Ladder wood | Stiles: a straight pole 8–10 cm thick; rungs 3–4 cm, split | Ash, oak or hickory rungs |
| Tools | Axe, saw, auger 2.5–3 cm, mallet, wedges | Axes, Chisels, Knives and Planes, Drills and Boring |
A small scaffold along one 8 m wall, two lifts high (about 4 m), needs roughly 10 standards, 10 ledgers, 25 putlogs, 6 braces, 20 boards and 60 lashings — about 500 m of rope.
Where to find it
- Poles: young, straight, fast-grown trees from a dense stand, where they grow tall and thin reaching for light — spruce, fir, larch and pine are traditional. Coppice (Firewood and Coppicing) gives straight ash, chestnut and hazel poles of exactly the size you want, regrowing every 7–20 years. In the tropics, bamboo is the best scaffold material there is: light, very strong, and still used on tall buildings in Hong Kong — though, like any wooden scaffold, it burns, so keep fires and hot work well away from it.
- Rungs: split from straight-grained ash, oak or hickory. Split wood follows the grain and is much stronger than sawn.
- Rope: hemp, flax, coir, or bark fibre (Flax, Hemp and Linen, Cordage and Rope). In Asia, split rattan or bamboo strips.
Peel poles and dry them for a few months under cover. Reject any with rot (soft, punky wood; mushrooms), deep cracks, insect holes or sharp bends.
Method 1: Ladders
The notched log (the first ladder)
A single log 15–20 cm thick, leaned against the wall, with flat steps cut into it every 30 cm. Quick, cannot fall apart, and good for lofts and pits. It rolls, so set its foot in a hole and lash its top.
The pole ladder
- Choose a pole of straight-grained ash, spruce or larch, 8–10 cm thick, a little longer than the ladder you want.
- Split it in half lengthwise with wedges (Basic Woodworking). The two halves are the stiles (the sides). Because they came from one pole, they bend alike and the ladder stays true.
- Lay them flat side up, side by side, 30–35 cm apart at the top and 40–45 cm apart at the foot — a ladder that widens toward the bottom is steadier.
- Mark the rungs every 25–30 cm (a hand-span and a bit), all exactly the same spacing. Uneven rungs make people miss their step.
- Bore holes 2.5–3 cm across right through both stiles, at a slight slope so the rungs will sit level when the ladder leans.
- Make the rungs of split, dry ash or oak, 3.5–4 cm thick in the middle, shaved round, with ends shaved down to fit the holes tightly.
- Drive them in, then split each end that comes out the far side with a chisel and drive a small dry wedge across the grain of the stile (so it does not split the stile). Saw off flush.
- Long ladders: fit an iron rod or a wooden tie-bolt across under every fifth rung to stop the stiles spreading.
- Finish with linseed oil only. Never paint a ladder — paint hides cracks.
A quick ladder can also be lashed: tie rungs across two poles with clove hitches and square lashings, as for the scaffold below. Check them before every climb; lashings slip.
Using a ladder safely
- Angle: 1 out for every 4 up (75°). Check it: stand with your toes against the foot of the ladder and stretch your arms straight out; your palms should just reach a rung.
- Firm, level footing. Never on loose stones or a slope. On soft ground stand it on a board; dig one foot in to level it, never prop it on a stone.
- Tie the top to something solid, and have someone foot it (stand on the bottom rung, hands on the stiles) until it is tied.
- Extend 1 m above the landing so there is something to hold as you step off.
- Three points of contact — two hands and a foot, or two feet and a hand — at all times. Face the ladder. One person on a ladder at a time.
- Carry loads up with a rope, not in your hands. Hoist them once you are up.
- Do not lean out sideways: keep your belt buckle between the stiles.
Method 2: The putlog scaffold
The traditional scaffold for building a masonry wall: a single row of standards stands outside the wall, and the inner ends of the cross-poles rest in the wall itself.
- Footings. Set each standard on a flat stone or a short thick board (a sole plate), or in a hole 30–60 cm deep with a flat stone at the bottom, rammed tight. A standard on loose soil sinks under load, and the scaffold tilts.
- Standards. Stand them in a line 1.2–1.5 m out from the wall and 2–2.5 m apart along it, leaning very slightly in toward the wall. Plumb them by eye from two directions, or with a plumb line.
- First ledger. Lash a ledger along the standards at about 1.5–2 m above the ground (one lift), level. Use a square lashing (below). Where two ledgers meet, overlap them by at least a metre past a standard and lash both ends.
- Putlogs. As the wall rises to that height, the masons leave a putlog hole in the wall — a gap about 15 × 15 cm (one stone or brick left out), going 20–30 cm into the wall — every 1–1.5 m along the course. One end of each putlog rests on the ledger, lashed down; the other end sits in its hole. The rows of small square holes you see in medieval walls are these holes, never filled in.
- Boards. Lay at least three or four boards side by side (60–90 cm wide) across the putlogs. Each board must rest on at least three putlogs, or on two if it is short, and overhang its end support by 10–20 cm — not more, or it tips up when someone steps on the end. A 4–5 cm board should span no more than about 1.5 m between putlogs. Tie or wedge boards so they cannot slide.
- Guard rail. Lash a rail to the standards at about 1 m above the boards, and a middle rail at 50 cm. Nail or tie a toe board 15 cm high along the edge of the boards so tools and stones cannot be kicked off onto people below.
- Braces. Lash long poles diagonally across the outside face, from the foot of one standard up across two or three lifts, in a zigzag along the whole length. Without them the scaffold can fold sideways.
- Next lift. As the wall rises, lash the next ledger 1.5–2 m higher and repeat. To lengthen a standard, set a new pole beside it, overlapping by at least 1.5–2 m, and lash it in two places — or butt it end to end on top and bind it with two short splints.
- Ties. Every second or third lift, lash a pole through a window or round a pier to tie the scaffold to the building.
When the wall is finished, the scaffold is struck from the top down, and the putlog holes are filled or left.
The independent scaffold
Where the wall cannot hold putlogs — a timber frame, a finished wall, a chimney or a tower — use two rows of standards, 1–1.2 m apart, with ledgers along both rows and the cross-poles (now called transoms) lashed to both. It stands by itself, so it needs braces across the width as well as along the face, and still needs ties to the building.
For work under about 2 m (plastering, ceilings), two sturdy splay-legged trestles with boards across them are quicker and safer than a scaffold.
The square lashing
- Tie a clove hitch on the standard just below the ledger (Cordage and Rope). Twist the short end round the long one.
- Wrap. Take the rope up in front of the ledger, behind the standard, down in front of the ledger on the other side, and behind the standard again. Make four such full wraps, each lying outside the last on the ledger and inside on the standard. Pull each one as tight as you can, beating it with a mallet.
- Frap. Make two or three turns between the poles, around the wraps themselves, and heave tight. These frapping turns squeeze the wraps and make the joint hard.
- Finish with a clove hitch on the ledger, and tuck the end.
Lash the ledger above a natural knot or a nailed cleat on the standard if you can: that stops it sliding down if the lashing loosens. Many scaffolders also drive a small wooden wedge between rope and pole.
Safe working at height
- Inspect every morning: footings sunk? Lashings loose or chafed? Boards cracked or moved? Braces in place? And after every storm or frost.
- Do not overload. A scaffold for masonry should carry the people plus a small working stack of stone and mortar — roughly 200–300 kg per bay (one span between standards), spread out. Never pile stone in one heap, and never on the boards between supports.
- Keep the loads near the standards, not in the middle of a board span.
- Lift materials with a rope over a pulley or a gin pole (Cranes and Lifting), not up the ladder.
- Stop work in strong wind, ice, heavy rain or poor light.
- Keep everyone out from under the scaffold where work is going on overhead. Shout before you drop or lower anything.
- No climbing the outside of the scaffold. Use a tied ladder, with a gap in the guard rail where it lands.
Fall prevention and rescue
Guard rails come first. A rail that stops you falling is far better than any harness, because a harness only catches you after you have fallen.
Where a rail is impossible — on a roof slope, a steeple, a chimney top — tie on:
- Make a sit harness, never a loop round the chest. A rope tied round the chest alone can suffocate a person hanging in it within minutes. Take a 4–5 m length of strong rope or a sewn strap of thick webbing: tie it round the waist, then pass loops round both thighs and back to the waist knot, so the weight hangs from the legs and hips. A bowline round the waist with a figure-of-eight loop through the leg loops is a simple version (Cordage and Rope).
- Tie to an anchor above you — a main beam, a rafter, a chimney stack, a rope over the roof ridge tied off on the far side — never to a gutter, a lashing or a loose stone.
- Keep the slack short, so that if you slip you fall less than a metre. A long fall onto a rope can injure you as much as hitting the ground.
If someone falls or is left hanging:
- A person hanging in a harness must be got down quickly — within 10–15 minutes. Hanging still, blood pools in the legs and they can faint and die even when uninjured. Talk to them; if they can, they should push their legs against the wall or a rope loop to keep the leg muscles working.
- Lower, do not lift. Pass a rope round a beam or through a ring above them, tie it to their harness with a bowline, take a round turn round a post or the beam to give friction so one person can control the weight, cut or untie their first rope, and lower slowly.
- Once down, lay them down and treat them as any casualty (Emergencies): breathing, bleeding, then injuries.
- After a fall to the ground, assume a broken neck or back if they fell more than their own height, landed on their head, or have pain in the neck or back, numbness or tingling. Do not let them get up. Keep the head and neck still in line with the body. Move them only if they are in more danger where they lie, using several people to roll them as one piece onto a board (Emergencies, Nursing the Sick).
How to tell it worked
- The shake test. Two people push and pull on a standard at shoulder height. A good scaffold shudders a little as one piece; it does not sway, and no joint slips.
- Standards plumb and ledgers level by eye from the end of the run.
- The ladder test. Lay a new ladder on two logs near its ends, 20 cm off the ground, and have the heaviest person stand on each rung in turn, bouncing gently: no creaks, cracks or turning rungs.
- The board test. Walk every new board across a gap near the ground before it goes up.
Note Troubleshooting. Scaffold sways or leans → not enough diagonal braces, or no ties to the wall. Add braces in both directions and tie it in. Ledgers slide down the standards → lashings loose (natural rope slackens as it dries after rain, and new rope stretches). Re-lash with more frapping turns, use a cleat or knot below, and drive wedges under the rope. One corner sinking → standard on soft ground. Jack it up with a lever and put a broad stone or board under it. Boards bounce → putlogs too far apart. Add more, or use thicker boards. Ladder foot slides → too shallow an angle or slippery ground. Set it at 1-in-4, dig the feet in, or nail a cleat to the floor behind them. Rungs turn in their holes → rungs were green and shrank. Re-wedge them, and next time make rungs from dry wood.
Dangers
Danger Falls kill. Most deaths in building come from falls — from ladders, roofs and unguarded scaffold edges — and a fall of only 2 m onto hard ground can be fatal. Use guard rails, tie ladders, never work at height alone, and never climb tired, drunk or in wind or ice.
Danger Things falling from above — a dropped hammer, a stone kicked off a board, a collapsing scaffold — kill people below. Fit toe boards, keep people out from under the work, and wear a hard hat of thick leather or wood if you must be underneath.
Warning Scaffold collapse. Overloading, sinking footings, rotten poles and missing braces bring down whole scaffolds with everyone on them. Inspect daily, and strike (dismantle) from the top down, never by pulling out lower poles first.
- Rope burns and crushed hands when lifting poles; wear gloves.
- Lightning: get off tall scaffolds in a thunderstorm.
What this unlocks
Scaffolds let you raise tall walls (Stone Masonry), lay Roofs, turn Arches, Vaults and Domes, build chimneys and later erect Steel Frames and Tall Buildings; with Cranes and Lifting they make large buildings possible. Ladders serve every fire service (Firefighting) and Mining and Tunnelling shaft. Steel tubes and clamps (Steel in Quantity, Metal Pipes and Tubes) make the modern tube-and-coupler scaffold, quick to put up and reusable for decades.
How it was first done
Rows of sockets cut into the walls of the Lascaux cave in France, about 17,000 years old, are thought by many archaeologists to have held poles for a working platform for the painters. A rock painting in the Cuevas de la Araña in eastern Spain, perhaps 8,000 years old, shows a person on a long ladder or rope collecting wild honey. Egyptian builders used ramps of mud brick and wooden scaffolds, and Roman walls are full of putlog holes, as are the medieval castles and cathedrals of Europe, whose scaffolds were lashed with rope and wicker. Bamboo scaffolding has been used in China for well over a thousand years and is still common in Hong Kong. Steel tube scaffolding with clamped couplers was developed in Britain in the early 20th century and spread worldwide after the Second World War.