Part 6 · Building
Walls, Palisades and Watchtowers
How to protect a settlement from wild animals, thieves and floods — palisades of pointed logs, earth banks and ditches, stone walls and gatehouses, flood banks — and how to watch over it and raise the alarm from watchtowers with fire beacons and bells.
- Difficulty
- ●●●●●
- Time
- A thorn hedge round a camp in a day; a palisade or bank and ditch round a village in one season with twenty people; a stone wall in years; a watchtower in two to three weeks
- Steps from zero
- 13 prerequisites →
This unlocks
—The full path from nothing — 13 steps before this one
- Stone Tools
- Fire
- Shelter
- Finding and Preparing Clay
- Sanitation and Germs
- Simple Machines
- Finding and Purifying Water
- Quarrying and Cutting Stone
- The Kiln
- Lime
- Planning a Settlement
- Mortar and Concrete
- Stone Masonry
- Walls, Palisades and Watchtowers
Do them roughly in this order. See it on the tech tree →
Why it matters
A new settlement is exposed. At night wolves, big cats or hyenas take livestock; deer and pigs strip the gardens; thieves come for stores; a river in flood can sweep through in an hour. A boundary — hedge, palisade, bank and ditch, wall — makes a safe inside for animals, stores and children. From a watchtower someone sees a forest fire, a rising flood or strangers on the road far off, and with a beacon or a bell everyone knows within minutes.
These works exist to keep out and to warn. They also define the settlement: where tolls are taken, where travellers wait in quarantine during an epidemic (Infectious Diseases), and where the fire and flood watch lives (Firefighting).
How it works
A barrier only delays. It works when it delays long enough for someone to notice and act. So every boundary is a system: barrier + watcher + alarm + gate you can close.
What must it stop?
| Threat | What works |
|---|---|
| Deer | Height: deer clear 2–2.4 m. A 2.5 m fence, or a lower one with a wide ditch in front. |
| Wolves, dogs, hyenas | A solid, tight barrier 2 m high with no gaps to squeeze or dig under; stock shut in at night. |
| Big cats | They climb anything. Animals in roofed night pens of thorn or solid timber (Fences and Hedges). |
| Bears, pigs | A strong barrier, and no food left outside; electric fencing where you can (Electric Fences). |
| Elephants | Ditches 2 m wide and deep, or fences hung with beehives they avoid (Beekeeping). |
| Thieves | A continuous boundary, few gates shut at night, light, dogs (Working Dogs) and a watch. |
| Floods | A bank or wall of compacted earth or stone, higher than the highest flood, with no gaps. |
Ditch and bank multiply each other. Dig a ditch and throw the earth up on the inside to make a bank: the height to climb is the ditch depth plus the bank height. A 2 m ditch and a 1.7 m bank make a 3.7 m obstacle from one shovelful of work.
Perimeter grows slower than area. A round enclosure of 1 hectare has a boundary of about 355 m; of 4 hectares, only 710 m — twice as long for four times the land. Compact, roughly round shapes need the least wall. Long, thin layouts are costly to enclose (Planning a Settlement).
Seeing far needs height. On flat land or sea, the distance to the horizon from a height h metres is about 3.6 × √h kilometres: 2 m (standing) — 5 km; 10 m — 11 km; 25 m — 18 km. Tall things — a smoke column hundreds of metres high, a hilltop beacon — can be seen from much further, because they rise above their horizon too: add 3.6 × √(their height) to your own.
What you need
| Work | For each metre of boundary, roughly | Tools |
|---|---|---|
| Thorn hedge (dead hedge) | An armful or two of cut thorn | Axe, billhook, gloves |
| Palisade, 3.3 m high | 5 logs 20 cm thick and 4.5 m long; 1 m³ of trench dug and refilled | Axes, saws, spades, rammers, rope (Axes, Chisels, Knives and Planes, Files and Saws) |
| Bank and ditch | 4 m³ of earth moved: about 2 person-days by hand | Spades, picks, baskets or barrows (The Wheel and Axle) |
| Mortared stone wall, 4 m high | 4–6 m³ of stone, 1–1.5 m³ of lime mortar | See Stone Masonry, Lime |
| Flood bank, 2 m high | 10–15 m³ of earth, clay for the core, turf | Rammers, spades |
Count before you start: a palisade round 1 hectare needs some 1,800 logs — a whole wood — and a bank and ditch about 700 person-days, twenty people for five weeks. Most settlements start with a thorn hedge or a bank and build stone over generations.
Thorn hedges and first barriers
The first night's protection is a dead hedge or boma: cut thorn branches piled 1.5–2 m high and 2–3 m thick, butts inward, interwoven, with a gap closed at night by a thorn bush on a rope (Fences and Hedges). Plant a living hedge of thorn along the same line: in 7–15 years it replaces the dead one and lasts centuries.
The palisade
A palisade (also called a stockade) is a fence of tall logs set upright side by side in a trench, with pointed tops.
- Mark the line as short as the site allows. Keep 5–10 m clear inside for a path, and clear brush 20–30 m outside so the watch can see.
- Cut logs 20–25 cm thick and 4–4.5 m long of a durable wood — oak, chestnut, larch, cedar, black locust (Rot, Woodworm and Termites) — and strip the bark.
- Char the butts black for the bottom 1.5 m, or coat them with hot tar (Tar, Pitch and Glue): it doubles their life in the ground.
- Point the tops to a 4-sided point about 30 cm long; it sheds rain and stops climbing.
- Dig the trench 1.0–1.2 m deep (a quarter of the log length) and 50–60 cm wide.
- Set the logs touching, thick and thin ends alternating. Plumb each one (Stone Masonry) and ram earth and stones round it in 20 cm layers (Cob, Adobe and Rammed Earth).
- Rail them together on the inside at two-thirds height with a split log or squared timber pegged or spiked to every post (Nails, Rivets and Wire Fasteners), so no single log can be pushed over or pulled out.
- Where the watch must see over, build an earth step or walkway inside, 1.3 m below the tops.
Life: charred oak, chestnut or larch 15–25 years; pine, spruce or birch 5–8. Probe each post at ground level every spring and replace rotten ones singly. Split half-logs use half the trees; set on a bank, shorter logs give the same height.
Earth ramparts and ditches
The earthwork is the cheapest strong boundary and lasts thousands of years — prehistoric banks still stand across Europe.
- Lay out three parallel lines with pegs: the outer edge of the ditch, the inner edge of the ditch, and the inner foot of the bank. For a medium work: ditch 3 m wide at the top, 1 m at the bottom, 2 m deep; a berm (flat strip) 1–1.5 m wide; bank 5 m wide at the base, 1 m at the top, 1.7 m high.
- Strip the turf first in 30 cm squares and stack it to face the bank.
- Dig the ditch and throw the earth across the berm. Spread it in 20–30 cm layers and ram each layer, clay and stony earth in the core and outer face.
- Slopes no steeper than 1 in 1.5 (about 35°) in plain earth; faced with turf laid like bricks, 60°; flatter in sand. A revetment of planks and posts or dry stone (Stone Masonry) lets the face stand vertical.
- Drain the ditch with a steady fall of at least 1 in 200 to an outlet. Standing water breeds mosquitoes and drowns children. A wet ditch (moat) must be fed by a stream and flow out again.
- Top it with a palisade, hurdles or a thorn hedge, and sow grass on bare earth before the first heavy rain: a bare bank gullies in one winter.
Flood banks
A flood bank (levee, dyke) keeps a river out of a settlement or its fields. It is a long, low earth dam, and the rules of Dams and Reservoirs apply: water must never flow over it, and seepage must never carry soil out of it.
- Height: the crest at least 1 m above the highest flood mark you can find (drift lines, mud stains, old people's memory — see Planning a Settlement).
- Shape: crest at least 3 m wide (a cart track along it lets you bring earth in a flood); river-side slope 1 in 3, land-side slope 1 in 2 or flatter.
- Building: strip the topsoil and roots from the footprint. Dig a key trench 1 m deep along the centre line and fill it with rammed clay. Build in layers 15–20 cm thick, each one rammed until the rammer bounces. Put clay in the centre and on the river face, sandier soil on the land side so seepage drains out without washing soil.
- Protect it: turf it and keep it grazed short. No trees and no burrowing animals — roots and burrows make pipes that blow out in a flood. Face the river side with stones (riprap) where the current strikes.
- Drains through it: a culvert of stone or clay pipe (Tiles and Clay Pipes) with a flap valve on the river end — a hinged hardwood or iron flap over the pipe mouth. Water from inside pushes it open; a rising river presses it shut.
- Road gaps in a flood wall: grooves in the stone on both sides, and a stack of stop logs (heavy planks) to drop in when the river rises.
In a flood, walk the bank day and night. Where water bubbles up with sand on the land side (a boil), ring it with sandbags so a pool holds the water back. Raise low spots with sandbags laid like bricks.
Stone walls
A stone wall lasts longest and burns not at all. Build it by the rules of Stone Masonry; what is particular to a settlement wall:
- Thickness. Dry stone: base about half the height, battered (sloping inward) about 1 in 6 on each face, with through-stones every metre. Mortared rubble in lime: thickness about a quarter to a third of the height — 1.2 m for a 4 m wall — with ashlar or large squared stones at corners and gates.
- Foundations on firm ground below the frost and below the topsoil, wider than the wall by 15–20 cm each side (Foundations and Floors).
- Coping: a top of large flat stones or a capping of mortar that throws rain clear of both faces. Water getting into the core is what destroys walls.
- Drains at ground level every 10–20 m; where a stream passes under, an arched culvert with an iron grille (Arches, Vaults and Domes). A wall over 2 m thick can carry a path for the watch, with a parapet 1.1–1.3 m high.
Gates and gatehouses
The gate is the weak point and the busiest place in any wall.
Sizes. A loaded farm wagon needs an opening 3 m wide and 3.5–4 m high; a gate for people and pack animals only, 1.5 m wide and 2.5 m high.
The leaves.
- Build each leaf of two layers of oak planks 3–4 cm thick: the outer layer vertical, the inner layer horizontal or diagonal, so the leaf cannot sag or split and a plank cannot be prised out.
- Fasten the layers with iron nails driven right through and clenched (bent over and hammered flat) on the inside, every 10–15 cm (Nails, Rivets and Wire Fasteners).
- Hang each leaf on two or three iron strap hinges turning on pintles — iron pins set into the stone jamb with lead or into a massive oak post (Doors, Windows and Joinery, Blacksmithing). A leaf of this kind weighs 300–500 kg; a stone or iron pivot under the hanging edge takes the weight better than hinges alone.
- Cut a wicket: a small door about 0.7 m wide and 1.6 m high in one leaf, with its own bolt, so one person can pass without the gate being opened.
The drawbar. A squared oak beam 15 × 15 cm, longer than the opening, slides out of a deep socket in one jamb — as deep as the beam is long — across the back of both leaves, and into a shallow socket in the other jamb. Closed, it locks both leaves to the wall itself. Add a lock or a padlocked iron hasp for the wicket.
The gatehouse is a short passage through a thickened stretch of wall, with a gate at each end and a room above for the keeper, the lamp (Lamps and Candles) and the bell rope. It gives a dry place to inspect goods and take tolls and, with both gates shut, to hold a cart or traveller apart in time of epidemic. A sliding shutter in the outer gate lets the keeper see who knocks.
Watchtowers
A watchtower is a tall frame or tower with a platform from which one person can see the whole settlement and its surroundings. It is for spotting fires (the most important use in most places), floods, lost travellers and strangers, and for ringing the alarm.
Building a timber tower
- Site: the highest ground with a clear view of fields, road and woods. A hilltop nearby may see more than a tower twice as tall in the valley.
- Size: platform about 2 × 2 m at 8–10 m; footprint 3 × 3 m, the posts leaning in about 1 in 20. The base should be at least a third of the height.
- Posts: four poles 20–25 cm thick of durable wood on stone pads (Foundations and Floors) or set 1.2 m deep with charred butts. Taller towers go up in storeys of 3–4 m, posts spliced with bolted scarf joints (Timber Framing and Log Building).
- Bracing: on every face of every storey, a horizontal girt and a diagonal X brace, bolted or pegged at each crossing. Without diagonals a tower racks and falls in the first gale; with them it is a rigid truss (Trusses and Frames).
- Platform: planked, with a trapdoor and a guard rail 1.1 m high with a mid-rail (Scaffolding and Ladders); a light pyramid roof against sun and rain; a ladder in flights inside the frame.
- Guy ropes on exposed hills, from the top girt to anchors 6–8 m out (Cordage and Rope).
- Lightning conductor: an iron rod 1 m above the roof, joined by iron strip or thick wire to a plate buried in damp ground (Static Electricity and the Leyden Jar). A tall tower on a hill will be struck.
A stone tower, 4–6 m across with walls 1–1.5 m thick, lasts centuries and does not burn, but takes a season of masons' work.
Watching for fires
In fire season the watch scans the horizon every 15 minutes for smoke. To find where it is, make a fire finder: a round table with a map of the district fixed to it pointing true north (Maps and Mapmaking, Finding Direction), a 360-degree circle marked round its edge (Measuring Angles: Theodolite and Sextant), and a sighting bar pivoted at the centre with a slit vane at one end and a vertical hair at the other. Sight the smoke and read the bearing. Two towers reporting their bearings (by runner, flag, or later The Telegraph or The Telephone) give two lines on the map, and where they cross is the fire — the triangulation of Surveying and Levelling.
Fire beacons
A fire beacon is a fire laid ready on a high place, to be lit as a signal seen for 20–30 km at night.
- Platform of stone or earth on the highest point, 20 m clear of trees and buildings; or, for a small beacon, an iron fire basket (cresset) on a stout post.
- Lay the fire: 1–2 m³ of dry split wood over kindling and tinder, with pitch-soaked faggots or a tar barrel in the middle for a tall flame (Tar, Pitch and Glue).
- Keep it dry under a thatched or hurdle cover that pulls off, with a means of fire beside it: a covered lantern, or flint, steel and tinder in a sealed pot.
- For daytime, a heap of green branches or wet straw to throw on for thick white smoke.
- Agree what it means in advance — "danger, come", "fire", "flood" — and test it once a year on an agreed night. Chains and codes are in Signal Fires, Flags, Semaphore and Heliographs.
The alarm bell
The settlement's alarm bell hangs in the watchtower, the gatehouse or a frame in the square, where the watch can reach its rope. A bell rung fast and without pause means fire or danger everywhere; agree other patterns for flood or for calling a meeting (Fire Extinguishers and Alarms).
- Size: a bronze bell weighs roughly 0.55 × D³ tonnes, where D is the mouth diameter in metres: 40 cm — 35 kg; 50 cm — 70 kg; 70 cm — 190 kg. A bell of 50–100 kg is heard all over a village and its fields; a town needs one or several of 200 kg or more.
- Proportions: mouth diameter about equal to the height; the thickest part of the rim (the sound bow, where the clapper strikes) about one-thirteenth of the mouth diameter.
- Metal: bell metal of about 78% copper and 22% tin, cast in a loam mould (Bronze, Metal Casting).
- Hanging: from a strong oak beam or iron bracket by its crown, with an iron clapper hung inside on a leather strap, or a hammer on a rope outside for quick striking. Shelter it from rain, which rusts the fittings.
Until you can cast a bell, an iron gong or a hung length of steel rail serves well (Fire Extinguishers and Alarms).
How to tell it worked
- Walk the boundary weekly and after storms: no gaps, leaning posts, holes dug under, slumps or blocked ditches. Night losses of livestock stop.
- Gates close fully and the drawbar slides home without forcing.
- The flood bank stays dry on the land side in high water, or only damp with clear seepage.
- The watch: light a small smoky fire somewhere the watch was not told of; time how long until the bell rings and check the bearing. Is the bell heard in the farthest house at night?
Note Troubleshooting. Palisade posts lean outward → trench too shallow or poorly rammed, or the bank behind them pushing. Re-set with deeper butts, add a second rail, or prop with raking struts inside. The bank slumps into the ditch → slopes too steep or no berm. Cut it back to 1 in 1.5, add a berm, turf it. The ditch holds water and stinks → no fall. Re-dig the bottom with a steady slope to an outlet. Water comes up through the ground behind the flood bank → seepage under the bank. Ring boils with sandbags in a flood; afterwards add a clay key trench or a wider bank with a drain at its land-side toe. The tower sways in wind → missing or loose diagonal braces. Tighten every bolt, add braces and guy ropes.
Dangers
Danger Trench and ditch collapse. A wall of earth falling into a trench buries and crushes; a cubic metre of earth weighs over 1.5 tonnes. Never work in a trench deeper than your waist with vertical sides: slope the sides back at least 1 in 1, or prop them with planks and cross-struts. Keep spoil heaps at least 1 m back from the edge.
Danger Falls and lightning. A fall from a tower platform kills. Rails on every side, a trapdoor that is kept shut, no climbing in ice, high wind or thunderstorms. A tower without a lightning conductor will in time be struck and may catch fire with the watch on it.
- Raising logs: a 4.5 m oak log weighs over 100 kg. Raise with ropes; nobody in the trench or where it could fall.
- Gates: a 400 kg leaf swinging in a gust crushes; fit hooks to hold leaves open.
- Beacon fires can light the hillside: clear 20 m around them and keep water and beaters ready (Firefighting).
- Walls trap people too. Gates must open quickly from inside for escape from fire and flood (Fire Extinguishers and Alarms).
What this unlocks
A safe enclosure lets a settlement keep livestock and stores, hold markets and grow into a town (Money, Trade and Record-keeping, Organising a Community). Flood banks reclaim rich river land for farming, once it is drained (Field Drains, Terraces and Erosion Control, Irrigation, Farming from Seed). Watchtowers lead on to forest fire-lookout services (Forestry and Tree Nurseries), chains of signal stations, the optical telegraph and the electric The Telegraph (Signal Fires, Flags, Semaphore and Heliographs); bells lead to The Mechanical Clock towers, and later to the electric alarms of Electric Bells, Buzzers and Alarms.
How it was first done
At Jericho, about 8000 BC, people built a stone wall and a stone tower 8.5 m tall; whether for defence, flood protection or ceremony is still argued. Banks, ditches and palisades ringed prehistoric settlements across Europe, and Iron Age hillforts such as Maiden Castle in England (from about 600 BC) had several lines of ramparts. The Romans built watchtowers along their frontiers, as on Hadrian's Wall (from AD 122), and Chinese frontier walls carried beacon towers that signalled with smoke by day and fire by night. In England a chain of hilltop beacons warned of the Spanish Armada in 1588. The Dutch began building dykes against the sea and rivers around the 11th century and set up local water boards to maintain them by the 13th; much of the Netherlands still lies behind them. Fire-lookout towers spread across the forests of North America in the early 20th century, and William Bushnell Osborne of the US Forest Service designed the fire finder named after him in 1915.