Wells and Cisterns

How to find water under the ground, dig and line a well that will not collapse or poison you, lift the water with a windlass, and catch rain from a roof in a sealed cistern that carries you through the dry season.

Difficulty
●●●●●
Time
A week to a season to dig a well, depending on depth and ground; two to four weeks to build a cistern
Steps from zero
9 prerequisites →

You need first

Stone MasonrySimple Machines

This unlocks

—
The full path from nothing — 9 steps before this one
  1. Stone Tools
  2. Fire
  3. Finding and Preparing Clay
  4. Simple Machines
  5. Quarrying and Cutting Stone
  6. The Kiln
  7. Lime
  8. Mortar and Concrete
  9. Stone Masonry
  10. Wells and Cisterns

Do them roughly in this order. See it on the tech tree →

Why it matters

A stream ties you to one spot, dries up in a drought, and is fouled by everyone upstream. A well lets you settle almost anywhere, gives water filtered through metres of soil, and keeps flowing in the dry season. A cistern (a sealed tank for rainwater) lets you live where there is no groundwater at all — on rock, islands, hilltops — by storing the wet months' rain for the dry ones.

Together they are the step from finding water (Finding and Purifying Water) to owning a reliable supply. A protected well, with the latrine (Sanitation and Germs), was the biggest single improvement in health for most villages in history.

How it works

Water under the ground

Rain soaks down through soil and loose rock until it reaches a layer it cannot pass, usually clay or solid rock. Above that layer every gap between the grains fills with water; the top of this soaked zone is the water table. A well is a hole that reaches below it, so water seeps sideways into the hole.

A layer that holds and passes water well is an aquifer — sand, gravel, sandstone, cracked limestone. Clay gives its water up so slowly that a well in pure clay may take a day to refill a few buckets.

Three things follow:

  • The water table is lowest at the end of the dry season. A well dug in spring may be dry by late summer. Dig in the dry season, so the depth you reach is the worst case.
  • It roughly follows the shape of the land, but flatter: close to the surface in valleys, deep under hills.
  • Water moves through the ground — about a metre a day in sand, but hundreds of metres a day, unfiltered, through cracked rock and limestone. Whatever soaks in near your well (latrines, dung, graves) can reach it.

Rain on a roof

One millimetre of rain on one square metre of roof is one litre of water. A roof 8 × 6 m (48 m²) with 600 mm of rain a year catches 28,800 litres. Count on keeping about 80% from a hard roof — some 23,000 litres a year, enough for five people drinking and cooking with 12 litres each a day.

What you need

Item For Notes
Spade, short pick, digging bar Shaft Wood or iron
Buckets, 10–15 litres Spoil and water Leather, wood, or pitched basketwork
Rope 2–3 cm thick Hoisting Twice the well depth; see Cordage and Rope
Windlass, tripod or shear legs Lifting spoil and the digger See Simple Machines, Cranes and Lifting, Lifts, Hoists and Mine Winding
Stone, fired Bricks or oak timber Lining
Hydraulic mortar Sealing the top; cisterns See Mortar and Concrete
Clay, "puddled" (kneaded wet) Sealing behind the lining See Finding and Preparing Clay
Washed gravel Behind and under the intake
Candle or oil lamp Testing the air
Plumb line Keeping the shaft true See Measurement from Scratch

Where to find it

Look for the signs of shallow groundwater:

  • Low ground: valley floors, the foot of slopes, flats beside rivers. The bottom of a dry valley beats its sides.
  • Springs and seeps: a line of springs along a hillside marks where water runs out over a clay or rock layer; a well just uphill of that line taps the same layer.
  • Water-loving plants: willow, alder, poplar, reeds, rushes, sedges, mint; in dry country date palms, tamarisk and mesquite. Green that stays green in drought is a strong sign.
  • Old wells, even filled in, show where water was found before.

Test before you commit. In soft ground, bore test holes 3–6 m deep in the dry season with an auger — a 7–10 cm iron or hardwood spiral on a long handle turned by a T-bar. If a hole fills from the bottom within a day, you have found the water table.

Note Water divining with a forked stick or bent wires has been tested many times under fair conditions and works no better than chance. Most valleys have water almost everywhere at some depth, which is why diviners seem to succeed. Trust the land, the plants and a test hole.

Choosing the exact spot. It must be:

  1. At least 30 m from any latrine, cesspit, grave, dung heap or animal pen — more in gravel or cracked rock — and uphill of them. See Sanitation and Germs.
  2. Above flood level, on ground that drains away from the well head.
  3. Close enough to the houses that people will use it rather than the river.

Method 1: The dug and lined well

A hand-dug well is a round shaft 1.2–1.5 m across inside — wide enough for one person to dig, narrow enough to line cheaply. Round, because earth pressing in on a ring squeezes it tight, like an arch lying on its side (see Arches, Vaults and Domes); a square shaft's walls bulge and fall in.

Windlass and crankdrum 15 cm, crank 40 cm, pawl Parapet70–90 cm above ground Apron1.5–2 m wide, slopesaway to a soakaway Well bucketnever set on the ground Dry ground Sealed liningtop 3 m: mortar joints,puddled clay behind Water tablelowest at end of dry season Gravel packwater seeps in throughopen stone joints Water-bearing sanddig 2–3 m into it if you can Bottomgravel layer stops stirring mud 1.2–1.5 m inside
Fig. 1 A finished dug well in cross-section. Above the water table the lining is sealed so that dirty surface water cannot run down behind it; below the water table the joints are left open so groundwater can seep in.

Way A: dig, then line (firm ground)

In firm clay, chalk or soft rock that stands up on its own:

  1. Mark the circle with a cord 75–85 cm long swung round a centre peg (inside width plus the lining on each side).
  2. Set up the hoist before you are deep: a windlass on two forked posts, or a tripod (see Cranes and Lifting) with a pulley.
  3. Dig in stages of 1.5–3 m, round and vertical. Hang a plumb line from the centre of a bar across the top and measure from it to the wall at four points every 50 cm.
  4. Line each stage before digging the next: stone or brick in rings from the bottom up, breaking joints (see Stone Masonry), with puddled clay packed behind. Rest each stage's bottom course on a ledge of undug earth or a timber ring so it hangs safely while you dig the next.
  5. If the walls start to crumble or trickle, stop and line at once.

Way B: sink the lining (loose sand and gravel)

In sand, gravel or wet ground that will not stand up, build the lining on the surface and dig it down. Nobody ever stands below unlined ground.

  1. Make a curb: a ring of oak or elm the outside size of the lining, 15–20 cm thick, of curved segments pegged in two layers with crossing joints. Bevel the bottom outer edge so it slides into the ground. (Later, cast it in iron or concrete.)
  2. Set it level in a shallow pit and build 1–2 m of brick or stone lining on it in mortar, tied together by iron rods or wooden staves through the courses.
  3. Dig inside and under the curb evenly: the centre first, then undercut the edge a little at a time on opposite sides. The masonry's weight sinks it. Check level every 30 cm and dig more under the high side.
  4. Keep building on top as it sinks. If it sticks, load stones on top rather than digging far below the curb.

Getting below the water

Once water comes in, a team must bail as fast as the digger digs. Aim for 2–3 m below the dry-season water table; a well that only just touches water fails in a drought. Hand bailing may get you 1–2 m; for more, use a pump or deepen it next dry season. Below the water line, lay the lining without mortar so water seeps in through the joints, with clean gravel packed behind to keep sand out, and spread 15–20 cm of washed gravel on the bottom so the bucket does not stir up mud.

Finishing the top: keeping the well clean

Most wells are spoiled from the top — run-off, things falling in, and dirty buckets.

  1. Seal the top 3 m: point every joint with hydraulic mortar and pack puddled clay 15–20 cm thick behind. Surface water must then filter through 3 m of soil instead of running down the outside of the lining.
  2. Build a parapet of mortared stone 70–90 cm high against run-off, animals and children.
  3. Lay an apron of mortared stone or concrete 1.5–2 m wide all round, falling about 1 cm in 10 cm away from the well, with a channel taking spilt water at least 6 m away to a soakaway (a pit filled with stones) or garden.
  4. Cover it with a hinged lid or a little roof.
  5. Give the well its own bucket, hung on the windlass and never set on the ground.

Lifting the water

  • Two buckets on one rope over a pulley — one goes down as the other comes up — halve the work of a single bucket.
  • The windlass: a drum 15–20 cm thick turned by a crank. A 40 cm crank on a 15 cm drum gives an advantage of about 5, so a 15 kg bucket needs a push of about 3 kg plus friction. Fit a pawl (a hinged catch dropping into a toothed wheel) so a full bucket cannot run back and spin the handle into your face. See Simple Machines.
  • The shadoof for wells under about 4 m, or an ox driving a chain of buckets (the saqiya): see Irrigation.
  • The hand pump closes the well completely, so nothing falls in and no dirty bucket touches the water — the best of all for health. See Pumps.

How much will it give? Bail the well down by about 1 m quickly, then time how long it takes to recover. A well 1.3 m wide holds about 1,300 litres per metre of depth; if it recovers 1 m in two hours, it gives about 650 litres an hour, plenty for a village of a hundred people at 20 litres each a day.

Method 2: The rainwater cistern

Hard, clean rooftile, slate or lime plaster — not lead Gutterwith a leaf screen Hand pump or bucketdraws 15 cm above the floor Tight hatchdark inside, no insects First-flush pipefills with the dirty firstwash; a pinhole emptiesit slowly after the rain Sludgeclean out every 1–2 years Calmed inletturns up, does not stir the sludge Plaster lining3 coats, roundedcorners Overflowscreened, to asoakaway
Fig. 2 A roof-fed cistern. The first dirty water off the roof fills the first-flush pipe and stays there; clean water then passes on into a sealed, dark tank. A pump or a bucket draws from just above the sludge, and extra water leaves by a screened overflow.

Sizing it

Work out the longest dry spell you must survive, and multiply:

people × litres a day × days without rain = cistern size

Five people × 15 litres × 150 dry days = 11,250 litres, so about 12 cubic metres (1 m³ = 1,000 litres). Then check the roof can fill it: 12,000 ÷ (0.8 × yearly rain in mm) = roof area needed. At 600 mm a year that is 25 m².

A round tank 3 m across and 1.7 m deep holds π × 1.5 × 1.5 × 1.7 ≈ 12 m³. (π ≈ 3.14; see Arithmetic and Fractions.)

The catchment

  • Hard, smooth roofs only: fired clay tiles (Roofs), slate, stone slabs, or lime-plastered flat roofs. Thatch and turf give brown, bitter, germ-laden water — fine for washing and gardens, not for drinking.
  • Never lead roofs, lead flashing or lead gutters for drinking water. Rainwater is slightly acidic and dissolves lead. See Lead.
  • Gutters of wood, split bamboo, clay half-pipes or later sheet metal (Sheet Metal and Rolling), falling about 1 cm per metre toward the downpipe, with a coarse basket or screen to stop leaves.
  • A plastered courtyard, swept clean, also works — Venice filled its cisterns this way — but it collects more dirt than a roof.

The first flush

The first rain washes bird droppings and dust off the roof; keep it out of the tank. A first-flush pipe is a closed vertical pipe branching off before the tank: the first water fills it, then the rest flows past. A pinhole in its bottom empties it over a day. Size it at about 1 litre per square metre of roof. Without one, turn the downpipe aside for the first 10–15 minutes of each rain.

Building the tank

  1. Bury it, or half-bury it. The earth supports the walls and keeps the water cool, dark and frost-free. Keep it at least 15 m from any latrine, its top above flood level.
  2. Dig a round pit. In soft rock (chalk, soft limestone, marl, compacted volcanic ash) you can carve a bottle-shaped cistern with a narrow neck that only needs plastering; thousands of these still hold water around the Mediterranean.
  3. Walls: in soil, build a ring of stone or brick 30–40 cm thick in hydraulic mortar. Floor: 15 cm of rammed lime-pozzolan concrete, sloping gently to a small sump in one spot so the tank can be bailed out completely when cleaned.
  4. Plaster the inside with three coats of waterproof plaster — lime and pozzolan (crushed fired brick or volcanic ash), or later cement and sand 1 : 3 — 2–3 cm in all. Round every corner between wall and floor with a fillet of plaster as thick as your fist; corners are where cisterns crack. Polish the last coat hard with a smooth stone as it stiffens. Full method in Mortar and Concrete.
  5. Roof it with a corbelled or arched dome (Arches, Vaults and Domes), stone slabs on stone beams, or a reinforced slab (Reinforced Concrete). Wooden covers rot in the damp air and drop rot into the water. Leave a manhole with a tight lid for cleaning.
  6. Cure it wet for 2–4 weeks before filling. Fill it a third at a time, a week apart, and watch for leaks.
  7. Fit the inlet so the water enters near the floor and turns upward (a calmed inlet) instead of splashing down and stirring the sludge. Fit the overflow at the top, as wide as the inlet, screened with fine cloth or wire so mosquitoes and rats cannot get in. Draw water from about 15 cm above the floor, by pump, tap or a bucket kept only for the tank.

Keeping the water good

  • Dark and closed. Light grows algae; one gap breeds mosquitoes by the thousand.
  • Clean the cistern every 1–2 years at the end of the dry season: bail it empty, scoop out the sludge, scrub and repair the plaster.
  • If anything falls into a well, haul it out, bail the well empty two or three times, and boil drinking water until it looks and smells right again. Once you have bleach (Chlorine and Bleach), shock-dose the well after cleaning: about 1 litre of ordinary 5% household bleach for every 1,000 litres of water in the well (roughly 50 mg of chlorine per litre). Stir it in, wet the lining above the water line with the same mix, cover the well and leave it 12–24 hours. Then draw water off until the chlorine smell has gone, and boil drinking water for a few more days if you can.
  • Still boil drinking water when anyone is sick, after floods, or if you doubt the source. A well is safer than a river, not a guarantee. See Finding and Purifying Water and Water Treatment for a Town.

How to tell it worked

  • The well recovers to its normal level within hours after heavy use, and still holds water at the end of the driest month.
  • The water is clear and has no smell after it has stood in a clean pot for an hour. Cloudiness after rain means surface water is getting in: check the seal, apron and parapet.
  • The cistern holds its level. With the inlet blocked, the water should fall no more than a few millimetres a week in a covered tank. Mark the level with a stick and check.
  • Fewer cases of diarrhoea in the households that use it — the real test. See Sanitation and Germs.

Note Troubleshooting. Well goes dry in summer → not deep enough below the dry-season water table. Deepen it in the driest month, or sink a smaller lined shaft or bore hole in the bottom. Water muddy or full of sand → no gravel pack behind the open joints, or the bottom gravel is missing. Pull out the lowest courses and rebuild with gravel behind. Water turns cloudy after rain, or smells → surface water is getting in. Re-point the top 3 m, raise the parapet, extend the apron. Water salty near the sea → you are drawing too hard and pulling seawater in from below. Draw less, use several shallow wells, or catch rain. Cistern water green → light is getting in. Cover every hole. Cistern leaks → usually a crack at a wall-floor corner. Empty it, cut the crack out into a V, fill with plaster and add a fillet.

Dangers

Danger Bad air kills well-diggers and the people who try to rescue them. Old wells, pits and deep shafts collect heavy gases — carbon dioxide (historically "chokedamp") and sometimes others — that have no smell and leave no oxygen to breathe. A person climbing down collapses in a few breaths, and the second person who goes down to help dies too. Before anyone goes down — every morning, and every time the well has been left — lower a lit candle or lamp to the bottom. If it dims, flickers or goes out, nobody enters. A flame that keeps burning does not prove the air is safe: carbon dioxide can knock you out at levels a candle survives, and a candle does not detect carbon monoxide or other poisonous gases. Freshen the air by repeatedly dropping and hauling up a large bundle of leafy branches, or by blowing air to the bottom through a leather or cloth tube with a bellows (Bellows), then test again. A rotten-egg smell means hydrogen sulfide, which is poisonous even where a candle burns: do not enter. Never run a fire, charcoal brazier or engine in or near a well shaft. And never go down to rescue someone who has collapsed — haul them up by their safety rope.

Danger Collapse. Sand and gravel can pour in without warning and bury a digger standing in water. Line the well as you go in anything but firm ground, never dig more than one stage below the lining, and never undercut a lining by more than a hand's breadth.

  • Falling objects. A stone dropped 10 m can kill. Keep the rim clear; the digger wears a thick leather or wooden hat and stands aside when a bucket goes up. Check rope and hook daily.
  • The digger's own rope. Below 3 m the digger wears a chest rope (a bowline, see Cordage and Rope) tied to the windlass, and at least two people stay at the top at all times.
  • Children and animals fall into open wells. Always keep the parapet and a lid.
  • Contamination from a badly sited latrine is the most common danger of all, and it is invisible. Respect the 30 m rule.

What this unlocks

A clean, reliable water supply lets a village grow into a town. Wells feed pumps, and pumps driven by the The Windmill or The Waterwheel feed tanks and Pipes, Plumbing and Aqueducts. Large cisterns and reservoirs, with Surveying and Levelling to bring water in channels, become the water supply of cities; once the water is in, it must go out again through Sewers and Wastewater. Boring deep, narrow wells with machines (see Drills and Boring) leads to brine wells for Salt and, much later, to Petroleum and Refining.

How it was first done

The oldest known wells were dug about 10,000 years ago by early farmers on Cyprus, cut through soft rock to water up to 8 m down. A stone-lined well in the drowned village of Atlit-Yam, now under the sea off the coast of Israel, is about 9,000 years old. In Germany, timber-lined wells built of split oak by the first farmers of central Europe have been dated by their tree rings to about 5100 BC; the log-box corner joints are still crisp.

Every dry civilisation depended on cisterns. Rock-cut, lime-plastered cisterns held the winter rains in the hills of Israel and Jordan from the Iron Age, and the Nabataeans of Petra captured every desert flash flood in tanks. Rome and Constantinople stored aqueduct water in vast covered cisterns; the Basilica Cistern in Istanbul, built under Emperor Justinian in AD 532, holds about 80,000 m³ under a forest of 336 columns. In India, step-wells such as Chand Baori (9th century) let people walk down 13 storeys of steps to the falling water table. In China, by 1835, salt-makers using bamboo cables and percussion drills had bored the Shenhai brine well in Zigong to a depth of about 1,000 m — entirely by human and animal power.

Source: content/entries/building/wells-and-cisterns.md