◆ Rebuild

Part 6 · Building

Pipes, Plumbing and Aqueducts

How to bring clean water from a distant spring to every house without lifting a bucket — by gravity, in lined channels, aqueducts and pipes of clay, wood, lead or iron — with siphons to cross valleys, valves to control it, and a water tower to give it pressure.

Difficulty
●●●●●
Time
Weeks for a pipe from a spring to a few houses; years for a town aqueduct
Steps from zero
18 prerequisites →

You need first

Tiles and Clay PipesLeadSurveying and Levelling

This unlocks

Toilets, Sinks, Baths and ShowersFirefightingHot Water and Central HeatingWater and Gas MetersWater Treatment for a Town
The full path from nothing — 18 steps before this one
  1. Fire
  2. Cordage and Rope
  3. Stone Tools
  4. Finding and Preparing Clay
  5. Finding and Identifying Ores
  6. Measurement from Scratch
  7. Writing and Numbers
  8. Hunting and Trapping
  9. Basic Woodworking
  10. Pottery
  11. The Kiln
  12. Charcoal
  13. Arithmetic and Fractions
  14. Hides and Leather
  15. Tiles and Clay Pipes
  16. Surveying and Levelling
  17. Bellows
  18. Lead
  19. Pipes, Plumbing and Aqueducts

Do them roughly in this order. See it on the tech tree →

Why it matters

Carrying water is heavy, slow work. A family using 100 litres a day lifts and carries 100 kg, every day — in much of history, mostly the work of women and children. A pipe from a spring above the village ends that for good. It also changes health: water that flows from a protected source in a closed pipe is far cleaner than water dipped from a river, and plentiful water means washing, which means less disease (see Sanitation and Germs).

Piped water lets a town grow beyond the size its wells can support. It feeds fountains, baths, laundries, breweries, mills, steam boilers and fire-fighting. Every city of the ancient world that grew large did it on aqueducts. When the water is in, it must go out again: see Sewers and Wastewater.

How it works

Head and pressure

Water flows from a higher place to a lower one, and the height difference — called the head — is what drives it. In a closed pipe, the water at any point pushes outward with a pressure set by how far below the source surface that point is:

Every 10 m of head = 1 bar ≈ 1 kg pressing on each square centimetre.

A pipe 40 m below its spring tank carries 4 bar — enough to burst poor clay joints, and enough to throw a jet of water many metres. Gravity can push water uphill again, but never higher than the surface it came from.

Friction and pipe size

Moving water rubs against the pipe walls and loses head as it goes. The longer and narrower the pipe, the more it loses. The surprise is how strongly size matters: doubling the bore gives about six times the flow.

Approximate flow in a fairly smooth pipe with a fall of 1 m in every 100 m:

Bore Flow Per day Enough for (50 L each)
2.5 cm 0.14 L/s 12 m³ 240 people
5 cm 0.9 L/s 75 m³ 1,500 people
10 cm 5.4 L/s 465 m³ 9,000 people
15 cm 16 L/s 1,350 m³ 27,000 people

For a gentler fall of 1 in 1,000, expect a little under a third of these flows. Rough clay or wood pipes give less again. When in doubt, go one size bigger.

The hydraulic grade line

Draw a straight line from the water surface at the source to the water surface where the pipe ends. A closed pipe that stays everywhere below this line will run full and flow. Where it rises above the line, the water there is under suction, air comes out of the water and gathers, and flow can stop altogether. So:

  • Every high point of a pipe collects air, which blocks it. Fit an air vent there — an upright pipe rising above the grade line, or a valve you open now and then.
  • Every low point collects silt. Fit a washout — a branch with a valve you open to flush it out.
Spring boxcovered and fenced Hydraulic grade linethe pipe must stay below it everywhere Inverted siphonsealed pipe dips down andup again under pressure Washout valveat every low point: flush silthighest pressure here Air valveevery high point Water towereach 10 m of height = 1 bar Housesbelow the tank
Fig. 1 A gravity water supply. The pipe follows the ground, dipping under a valley as an inverted siphon and climbing again, but always staying below the straight line from the source surface to the tank surface. Air gathers at high points, silt at low points.

Open channel or closed pipe?

  • An open channel (an aqueduct) carries water at atmospheric pressure, so it can be made of masonry and simple mortar. But it must fall steadily and gently the whole way, following the contours round every hill — often doubling the distance — and crossing valleys on bridges.
  • A closed pipe can go up and down with the ground, cutting straight across country, but must withstand pressure at every low point.

The ancient answer, and still a good one, was both: a channel for most of the distance, and pressure pipes where a valley was too deep to bridge.

What you need

Item For See
Level, staff, chain Laying out the route and slope Surveying and Levelling
Clay pipes, 60–90 cm long, socketed Low-pressure pipes and drains Tiles and Clay Pipes
Straight logs, 25–35 cm thick, 3 m long Wooden pipes Basic Woodworking
Long pipe auger Boring logs Drills and Boring
Sheet lead, solder Lead pipe, joints Lead, Soldering and Brazing
Cast iron pipe High-pressure mains The Blast Furnace and Cast Iron
Hydraulic mortar Channels, tanks, joints Mortar and Concrete
Tarred hemp rope Packing joints Cordage and Rope, Tar, Pitch and Glue
Cast bronze Valves and taps Bronze, Metal Casting

Where to find it

  • The source. A strong spring high above the town is best: its water has been filtered by the ground. Measure its flow in the dry season by timing how long it takes to fill a pot of known size. A stream high in uninhabited hills is second best; a reservoir behind a dam (Dams and Reservoirs) stores it through the dry season. See Finding and Purifying Water and Wells and Cisterns.
  • Logs for wooden pipes: elm (it barely rots while kept wet, and its twisted grain resists splitting), alder, pine and larch. Straight trunks, felled in winter and bored green.
  • Clay for pipes: any good pottery clay (Finding and Preparing Clay), better still a stoneware clay that fires watertight (Stoneware and Porcelain).
  • Lead from galena ore (Lead) — but see the dangers below.

Planning the supply

  1. Work out the demand. Allow at least 20 litres per person a day for drinking, cooking and basic washing; 50 litres for comfortable living; more for animals, gardens and trades. A town of 2,000 people at 50 litres needs 100 m³ a day — about 1.2 litres a second, continuously.
  2. Check the source gives more than that at the end of the dry season, with a margin.
  3. Survey the route. Level from the source to the town (Surveying and Levelling) and draw the profile — a side view of the ground heights along the route — on paper. Draw the grade line on it. Choose where to use channel and where pipe.
  4. Choose the fall. For a masonry channel, 1 in 1,000 to 1 in 3,000; less than that and it silts up and is hard to build accurately; much more and fast water scours the lining. For a pipe, use the whole fall available.
  5. Protect the source. Build a spring box: a small covered masonry chamber over the spring's outlet, with a screened overflow, a locked lid, and a fence or ditch keeping animals and people at least 30 m away uphill. Lead the pipe out from just above the floor so silt settles behind.

Method 1: Channels and aqueducts

A plastered channel 30 cm wide with water 20 cm deep, falling 1 in 1,000, carries about 25 litres a second — over 2,000 m³ a day, enough for a town of tens of thousands.

  1. Peg the line with the level every 20 m, each peg set at the exact height of the channel floor (Surveying and Levelling).
  2. Dig and build the channel: a floor of rammed lime concrete, side walls of stone or brick in hydraulic mortar, rendered inside with two or three coats of waterproof lime-pozzolan plaster, with rounded fillets in the corners (Mortar and Concrete).
  3. Cover it. Stone slabs or a small vault keep out dirt, leaves, animals and sunlight (which grows algae), and keep the water cool. Bury it where you can.
  4. Inspection shafts every 50–100 m let workers get in to clean out the lime scale and silt.
  5. Settling tanks along the way — a widened, deepened section where the water slows and drops its sand — are cleaned out regularly.
  6. Crossing obstacles. Small valleys on an embankment; deeper ones on a bridge of arches (Arches, Vaults and Domes, Roads and Bridges); hills through a tunnel (Tunnels and Rock Drilling) or around them on the contour.

Method 2: Pipes

Clay pipes

Fired clay pipes 60–90 cm long, with a socket (a widened end) on one end and a plain spigot on the other, are the cheapest pipe and last for centuries in the ground. Making them is covered in Tiles and Clay Pipes. They are strong in the ground but weak against internal pressure: use them for channels-in-pipe, drains and low-head supplies of no more than a few metres of head unless you have proved better.

Jointing: push the spigot fully into the socket, ram a ring of tarred hemp rope into the gap to centre it and stop mortar running in, then fill the rest with stiff hydraulic mortar (or clay for drains) and smooth it to a bevel. Lay them socket uphill, on a firm bed with a hollow dug under each socket so the pipe barrel bears evenly.

Clay pipe: spigot and socket Bored log pipe Lead pipe from sheet Plug valve (stopcock) Spigot Socket tarred rope rammed in, then lime or clay mortar Log 3 m longbore 5–10 cm Tapered enddriven tight into the next Iron bandstops splitting Seam soldered Sheet rolled rounda hardwood rod Wiped jointsolder smoothed witha greased cloth Bronze bodycast, bored conical Tapered plugground in with fine sand;a quarter turn shuts it open
Fig. 2 Four kinds of pipe and fitting. Clay pipes are joined spigot into socket and sealed. Bored logs are driven into each other and bound with iron. Lead pipe is rolled from sheet and soldered. A plug valve turns a bored tapered plug across the flow.

Wooden pipes

For moderate pressure, bored logs served most European towns until the 1800s.

  1. Choose straight logs 25–35 cm thick and about 3 m long, freshly cut. Strip the bark.
  2. Bore them end to end with a long auger: start with a 5 cm spoon bit, then enlarge to 8–10 cm. Support the log on trestles at exactly the height of the auger, lined up with string. Bore from both ends to meet in the middle if your auger is short.
  3. Taper one end of each log like a blunt pencil, and ream the other end into a matching conical socket.
  4. Drive the tapered end of each log into the socket of the next with a heavy mallet, and shrink or nail an iron band round the socket end so it cannot split.
  5. Bury them at once and keep them full of water. Wet, airless wood lasts decades; wood that dries and wets again rots in a few years.

Lead pipes

Lead is soft enough to bend round corners by hand and to join with solder. Roll a strip of cast sheet lead 3–6 mm thick round a smooth hardwood rod, butt the edges together, and run solder or molten lead along the seam (Lead). Join lengths with a wiped joint: flare one end, slip the other inside, and build up a bulb of solder (Soldering and Brazing), smoothed while plastic with a greased cloth. Lead pipe takes high pressure. But lead poisons water, especially soft or acidic water such as rainwater; see Dangers. Use it only where nothing else will do, and never for new drinking-water systems when clay, wood, iron or copper can serve.

Iron pipes

Cast iron pipes, cast in sand moulds with a socket at one end, take tens of bar of pressure and last a century or more. Joint them with a ring of tarred hemp rammed into the socket, then molten lead poured into the remaining gap through a clay collar, and finally hammered tight ("caulked") with a blunt chisel. Later, pipes of rolled and welded steel and drawn copper (Copper Smelting, Metal Pipes and Tubes) serve indoors.

Laying any pipe

  • Bury it below the frost line — 60 cm in mild climates, 1–1.5 m where the ground freezes hard — and at least 60 cm anywhere carts will cross.
  • Anchor bends. Water under pressure pushes outward at every bend and at dead ends. Bed each bend in a block of concrete or mortared masonry against undisturbed ground, or the joints will be pushed apart.
  • Lay it to a steady slope between the high and low points, with no small humps where air can hide.
  • Keep it at least 3 m from sewers and drains, and above them where they cross, so a leaking drain cannot seep in.

Siphons

The inverted siphon is a sealed pipe that carries water down one side of a valley and up the other, as in the figure. It works because the water still finishes lower than it started. The pipe at the bottom carries the full head as pressure, so this is where lead, stone or iron pipes are needed. Roman engineers at Lyon crossed valleys with bundles of lead pipes under heads of about 120 m.

The true siphon carries water up over a hump and down again to a lower point — say, from a pond over its bank. Fill the pipe completely (or suck the air out), close the lower end, put the upper end in the water, then open the lower end: water flows as long as the outlet stays below the source surface. The air pressure on the source can only push water up about 10 m at sea level, and in practice a siphon fails above about 7 m, because air coming out of the water gathers at the crest. Keep crests low and fit a filling cock at the top.

Valves and taps

  • Plug valve (stopcock): a tapered bronze plug with a hole through it, turning in a matching cone in the valve body. Cast the body and plug in bronze (Metal Casting); bore the cone; then grind the plug in: smear it with fine sand and oil and turn it back and forth in its seat until it fits with no gap. A quarter turn shuts it. Hardwood plug valves work for low pressures.
  • Flap valve (non-return valve): a hinged leather flap, weighted with a little lead, lets water pass one way only. Used at pump outlets and to stop dirty water flowing back.
  • Float valve: a hollow copper ball or a wooden float on a lever, which pushes a leather-faced plug against the inlet pipe when the tank is full. It keeps a tank topped up without overflowing.
  • Close all valves slowly. A long pipe full of moving water carries great momentum. Slamming a valve shut stops it at once and sends a pressure spike — water hammer — back along the pipe, strong enough to burst it.

Water towers and distribution

A header tank at the top of the town stores water during the night, when little is used, and gives it out in the morning and evening rush. Make it hold at least half a day's demand. Lifting it on a tower gives pressure to every house below: the higher the tank, the higher the water rises in the houses. A tank 10 m above the street fills ground-floor taps with about 1 bar and still reaches a second storey. Where there is no hill, fill a tower by pump, driven by The Windmill, The Waterwheel or The Steam Engine.

Distribute from the tank through mains (big pipes) along the streets, with branches to each house. Make the mains loops rather than dead ends if you can, so water does not stand still and go stale.

The Roman engineer Vitruvius gave good advice on sharing water. Split the supply at the distribution tank into three outlets at different heights: the lowest feeds public fountains, the next public baths, and the highest private houses. When the supply runs short, the houses lose water first and the public fountains last.

How to tell it worked

  • Flow at the far end is what you calculated. Time the filling of a known pot at the outlet and compare.
  • Every tap runs at full flow with the others open; if the far end of town dries up when the near end draws water, the main is too small.
  • No wet patches along the route. Walk it after a week in service: lush green strips over a buried pipe in dry weather mean leaks.
  • Clear water at the tap, and no illness from it — test as in Water Treatment for a Town. A town supply drawn from a river must be treated there before it is piped.

Note Troubleshooting. Water barely trickles though the pipe is full → an air lock at a high point; open or fit an air vent. Or the pipe is too small: lay a second pipe alongside. Flow falls month by month → silt at low points (open the washouts), roots in the joints, or lime scale building up. Flush; clear with rods; on hard water, plan bigger pipes from the start. Joints blow out at the lowest point → too much head for the pipe. Use stronger pipe there, or break the pressure with an open break-pressure tank part way down (a small tank where the water falls freely to the open air before entering the next length). Bends pull apart → no thrust block. Dig out, re-joint, and anchor them. Water muddy after rain → surface water getting into the spring box or channel. Seal and cover it.

Dangers

Danger Lead poisons drinking water. Soft, acidic water (rainwater, moorland and peaty water) dissolves lead from pipes, solder and tank linings, and the poison builds up in the body for years, damaging children's brains permanently. Do not use lead pipes, lead-lined tanks or lead solder for drinking water if you have any alternative. If you must, use them only for hard, limy water, which coats the pipe with a protective scale; always run the tap for a minute in the morning before drinking; and never use lead for hot water. See Lead.

Danger Trench collapse. Pipe trenches deeper than about 1.2 m in loose or wet soil can collapse and bury a worker standing in them. Slope the sides back or shore them with planks and struts, keep the spoil heap at least 60 cm back from the edge, and never work in a trench alone.

  • Contamination by back-flow. If a pipe loses pressure, dirty water can be sucked in through leaks or from a submerged hose or trough. Keep outlets above the rim of any tub or trough they fill (an air gap), keep pipes away from drains, and keep the system full.
  • Burst pipes under pressure can throw stones and shards; stand clear when first filling a new main, and fill it slowly with all air vents open.
  • Stagnant water in dead-end pipes and warm tanks grows germs. Flush little-used branches.

What this unlocks

A pressurised supply gives fountains, baths, fire hydrants (Firefighting) and indoor taps, and makes the flush toilet (Toilets, Sinks, Baths and Showers) and the town Sewers and Wastewater possible. Meters for charging each house fairly are in Water and Gas Meters. Water piped to workshops drives hydraulic presses and supplies breweries, tanneries (Hides and Leather), dye works and The Steam Engine boilers. Penstocks — steep pressure pipes — feed water turbines. In a building, the same skills plumb the hot-water systems fed by stoves (Hot Water and Central Heating).

How it was first done

The palace of Knossos on Crete (about 1700 BC) had sections of tapered terracotta pipe fitted narrow end into wide. King Sennacherib of Assyria built a stone aqueduct about 690 BC to bring water to Nineveh, with a bridge at Jerwan made of some two million cut stones. The Romans brought the craft to its ancient peak: from the Aqua Appia of 312 BC to the eleven aqueducts that served Rome by the 3rd century AD, with the Pont du Gard (1st century AD, about 49 m high) carrying the water of Nîmes over a river. The Latin word for lead, plumbum, gave us "plumbing", because Roman town pipes were lead.

After Rome, most European towns relied on wells and on bored elm pipes. London's New River, opened in 1613, brought spring water 60 km in an open channel and distributed it through elm pipes. At Versailles, cast-iron mains were laid in the 1660s and some carried water for more than three centuries. Steam pumps, cast-iron mains, and filtration through sand (first done for a whole town at Paisley, Scotland, in 1804, and in London from 1829) made modern city water supply possible in the 19th century.