Part 4 · Food and Farming
Field Drains, Terraces and Erosion Control
Too much water drowns crops on flat land and carries away the soil on slopes. How to plan and dig open ditches, lay stone and clay tile drains to an even fall, pull mole drains through clay with a mole plough, plough and bank along the contours, build bench terraces, grassed waterways and check dams, and heal a gully before it eats the field.
- Difficulty
- ●●●●●
- Time
- A day to dig 20–40 m of drain trench by hand; a season to drain a field; years to terrace a hillside; a weekend for a line of check dams
- Steps from zero
- 5 prerequisites →
This unlocks
—The full path from nothing — 5 steps before this one
- Understanding Soil
- Measurement from Scratch
- Writing and Numbers
- Arithmetic and Fractions
- Surveying and Levelling
- Field Drains, Terraces and Erosion Control
Do them roughly in this order. See it on the tech tree →
Why it matters
Water is the farmer's friend until there is too much of it in the wrong place.
- Wet land. Where water stands in the soil for weeks, roots drown, the soil stays cold in spring, ploughing is delayed, and animals get foot rot and liver fluke. Draining such land is one of the surest ways to raise harvests: the same field may yield a third to a half more, and some swampy ground becomes farmland for the first time.
- Sloping land. Rain running off bare slopes carries the best soil with it. One centimetre washed off a hectare is about 130 tonnes of topsoil; nature makes that centimetre back in something like a hundred years or more. A single storm on a bare, ploughed slope can take it.
Understanding Soil teaches you to read wet and eroding ground and gives the first quick fixes; Irrigation covers walled terraces and salt. This chapter builds the works properly and to last.
How it works
The water table. Below a certain depth, every pore in the soil is full of water. The top of that wet zone is the water table. Most crops need it at least 60–90 cm down in the growing season. In clay soils, water also sits perched above a tight layer, even where the deeper ground is dry.
A drain is a low place for water to go. A pipe or open channel below the water table, falling steadily to an outlet, lets water flow out. Between two drains the water table settles in an arch, lowest beside the drains, highest midway. The tighter the soil, the slower the water creeps sideways, and the closer the drains must be.
How rain takes soil. Raindrops hitting bare earth splash it loose. Thin sheets of water carry the loose soil off (sheet erosion), then gather in small channels (rills) and finally into deep gullies that grow uphill with every storm. Speed is everything: water flowing twice as fast can roll stones about 64 times as heavy. Every method below works by slowing water down, spreading it out, or giving it a safe road downhill.
What you need
| Item | Use | See |
|---|---|---|
| Water level or sight level, levelling staff, boning rods | Setting falls | Surveying and Levelling |
| A-frame level | Marking contours | Understanding Soil |
| Ranging poles, pegs, line | Setting out | Surveying and Levelling |
| Spade, draining spade (long, narrow, 10–15 cm wide), scoop for the trench floor, pick | Digging | Spades, Hoes, Rakes and Wheelbarrows |
| Clay drain tiles, 30–35 cm long, 5–15 cm bore | Pipe drains | Tiles and Clay Pipes |
| Stones, gravel, brushwood, turf, straw | Drain fill, dams | |
| Stakes, withies, wire | Check dams | Fences and Hedges |
| Mole plough, wire rope, capstan or winch | Mole drains | Below, Wire Rope and Cable |
| Plough and draught animals | Contour work | The Plough, Draft Animals and Harness |
Planning the drainage
- Find the outfall first. Water must have somewhere lower to go: a stream, a river or an existing ditch, below the level of your deepest drain. No outfall, no drainage.
- Find the wet ground. Walk the field after heavy rain and in early spring. Mark standing water, rushes and sedges, soft ground and spring lines (a row of wet patches along a slope, often where a sandy layer sits on clay). Dig test pits (Understanding Soil) and see where water seeps in and how high it stands after a day.
- Survey the levels. Measure the fall from the far corner of the field to the outfall (Surveying and Levelling). Draw it on a plan.
- Choose a layout.
- Natural: single drains up each wet hollow. For fields with a few wet patches.
- Gridiron: parallel laterals all entering one side of a main. For flat, evenly wet fields.
- Herringbone: laterals entering the main from both sides at a slant. For a field with a valley down its middle.
- Interceptor: a drain across the slope just above a spring line, cutting off water before it reaches the field. Often this one drain dries a whole slope.
Spacing and depth of laterals:
| Soil | Depth | Spacing |
|---|---|---|
| Heavy clay | 60–75 cm | 8–12 m; or 20–40 m with mole drains across |
| Clay loam | 75–90 cm | 10–20 m |
| Loam | 90–110 cm | 15–25 m |
| Sandy loam | 100–120 cm | 25–40 m |
Fall: never flatter than 1 in 200 (5 mm per metre) for 5–7.5 cm pipes; 1 in 100 is better. Large mains may go to 1 in 300. On steep ground, run laterals across the slope at a gentle fall rather than straight down it.
Pipe size, at a fall of about 1 in 200, in a wet climate:
| Inside size | Drains about |
|---|---|
| 5 cm | 0.4 hectare |
| 7.5 cm | 1 hectare |
| 10 cm | 2 hectares |
| 15 cm | 6 hectares |
Steeper falls carry more. A hectare drained at 20 m spacing needs about 500 m of laterals, about 1,700 tiles of 30 cm.
Open ditches
The ditch is the first drain and the outfall for all others.
- Shape: a flat bottom 30–45 cm wide, sides sloping back so they stand: about 1 across for 1 down in loam, 1½ across in sand, a little steeper in stiff clay. Depth 1–1.5 m for an outfall ditch.
- Fall: gentle, 1 in 500 to 1 in 1,000 in big ditches, so water flows without scouring the bed.
- Spoil: spread it thinly on the field, not in a bank along the lip, where it slumps back in and blocks water from entering.
- Outfalls of pipe drains into the ditch: set the pipe end 15 cm above normal water level, on a flat stone, with a stone apron below and a grating of iron bars or a stone slit to keep out rats and frogs.
- Clean every year in late summer: cut weeds, remove silt, and keep trees off the banks.
Open ditches take land and fill with weeds; inside fields, bury the water instead.
Stone and brush drains
The oldest covered drain, the french drain, is a trench filled with stones: Understanding Soil gives the method. Where stones are short, fill the bottom 30 cm with brushwood bundles (thorn, hazel, heather), laid lengthwise and trodden down, then straw or upside-down turf, then soil. In clay, brush drains last 10–30 years. A stone box drain, two upright flat stones with a capstone over them, carries more water and lasts for centuries.
Tile drains
Making the tiles
Plain, unsocketed clay pipes 30–35 cm long with a 5–8 cm bore for laterals and 10–15 cm for mains, made on a mandrel or a pipe press and fired hard (Tiles and Clay Pipes). Make junction pieces too: a main tile with a hole cut in its side while leather-hard, for a lateral to enter.
A good tile rings when tapped, is round and straight (roll it on a flat floor: it does not wobble), has square-cut ends, and does not soften after a day in water. A dull, crumbly tile will break up in the ground.
Laying them
- Set out each line with ranging poles. Drive a peg every 10–20 m along it and set the peg tops to the planned fall with the level.
- Dig from the outfall upwards, so water can always run away from you. Take the top spit off wide; finish with the draining spade, so the trench is 30–40 cm wide at the top and only 12–15 cm at the bottom.
- Grade the floor. Scrape the bottom smooth with the scoop. Check it with boning rods (Surveying and Levelling): two rods stand on the pegs, and a third, the same length, is moved along the trench floor; where its top sticks up above the line of sight, dig deeper, where it falls below, you have dug too deep, so fill with firm clay, not loose soil. A hollow collects silt; a hump blocks water.
- Lay the tiles from the low end, butting each against the last, with gaps of no more than 3–6 mm. Water enters through these joints.
- Cover each joint with a flat stone, a piece of broken tile, a handful of straw or a turf, and on clay cover the whole line with gravel or small stones to within 30 cm of the surface, so water can reach the pipe easily.
- Junctions: bring laterals into the main at a slant of 45–60°, pointing downstream, entering a little above the main's water. Seal round the joint with clay.
- Silt traps: where a long main changes direction, build a small brick or stone chamber with its floor 30 cm below the pipes and a lid, where silt settles and can be scooped out.
- Backfill gently by hand round the tiles first, then by spade. Never drop stones onto the pipes.
- Map every line from fixed marks; you will need it in fifty years.
Mole drains and the mole plough
In heavy clay, tile drains must be close and are costly. A mole plough makes an unlined round tunnel through the subsoil, like a mole's run, in one pass.
Building one
- Beam: a heavy timber, 15 × 15 cm and 2.5–3 m long, of oak, its underside shod with iron strip, so it slides like a sledge runner. The long beam bridges bumps and keeps the channel to an even grade.
- Leg: a steel or wrought-iron blade 12–20 mm thick, 10 cm wide, sharpened on its front edge, passing through a slot in the beam with holes and pins to set the depth (Blacksmithing).
- Mole: a steel cylinder 7.5 cm across and 30–40 cm long, with a pointed nose, forged or cast onto the leg's foot (Steel).
- Expander: a smooth plug about 9 cm across, towed 30–40 cm behind the mole on a short link, which presses the channel walls smooth.
- Hitch: a strong eye at the beam's nose for a wire rope or chain.
Pulling it in stiff clay takes a force of several tonnes, far beyond a team in harness pulling directly. Anchor a capstan at the far end: a drum about 30 cm across turned by a horse walking a sweep 4 m long gives a mechanical advantage of about 25 times (Animal Power and Treadwheels, Simple Machines). A steam or oil engine with a winch does the same job faster (The Tractor).
Using it
- Right soil: at least a third clay, sticky enough to roll into a long thin worm in the hand, with few stones or sand pockets. In sandy ground the channel collapses.
- Right time: when the subsoil at mole depth is moist and plastic but the topsoil above is drier, usually late spring or early summer. Then the leg cracks the soil above into fine fissures that lead water down.
- Depth 45–60 cm; spacing 2–3 m; runs up to 200 m, with a steady fall of at least 1 in 200, either straight into a ditch or across tile laterals that have gravel backfill, so the mole channels break into the gravel.
- Life: 5–10 years in good clay, then pull them again.
Contour farming and banks
On slopes, the aim is to make water walk, not run.
Contour ploughing and strips
Plough, sow and cultivate along the contour, marked out with an A-frame or level (Understanding Soil). Each furrow becomes a small dam. On gentle slopes (2–8 %) this alone roughly halves soil loss. For more protection, use strip cropping: strips 15–30 m wide along the contour, alternating a ploughed crop with grass, clover or hay (Fodder Crops and Winter Feed). Soil washed off the ploughed strip is caught in the grass below.
Contour banks (bunds)
A contour bank or bund is a low earth bank along the contour.
- Level banks for dry country hold all the rain so it soaks in. Turn both ends up the slope so water cannot escape round them.
- Graded banks for wet country lead water sideways along a shallow channel on their upper side, at a fall of about 1 in 300 (3 cm per 10 m), to a grassed waterway.
Building one: peg the line. Dig a trench 50–60 cm wide and deep along the upper side and throw the soil downhill to form the bank (or, the "fanya juu" way of East Africa, dig on the lower side and throw it uphill: the bank catches soil and the slope between banks slowly levels into terraces). Ram it in layers. Finished, it should stand 50 cm high after settling, about 1.5–2 m wide at the base. Grass it at once.
Spacing by slope:
| Slope | Distance between banks |
|---|---|
| 2 % | About 40 m |
| 5 % | About 22 m |
| 10 % | About 16 m |
| 15 % | About 14 m |
| Over 15–20 % | Bench terraces, or keep under trees and grass |
Living barriers. A single row of a tough clump grass planted along the contour does the same job slowly and cheaply. In the tropics, vetiver slips planted 10–15 cm apart grow into a dense hedge whose roots go 2–3 m down; it does not spread into the field. In cooler lands use a hedge (Fences and Hedges) or a strip of native bunch grass.
Grassed waterways
Every graded bank, ditch and terrace drain needs a safe road downhill. A grassed waterway is a broad, shallow, dish-shaped channel 3–10 m wide and 20–50 cm deep in the middle, running down the natural line of a valley, kept permanently under thick grass and never ploughed. Shape it and turf or sow it a season before water is sent down it, diverting runoff elsewhere until the grass is thick.
Terraces
On slopes steeper than about 15 %, only bench terraces keep soil in place under crops. Irrigation describes building the retaining walls and filling; here is the design.
Bench width. Choose the vertical interval (the height from one bench to the next): 1–1.5 m is usual; higher risers are hard to keep standing. The horizontal distance between terraces is the vertical interval divided by the slope:
| Slope | Horizontal spacing for 1 m interval | Bench width with earth riser | With stone riser |
|---|---|---|---|
| 15 % | 6.7 m | 5.7 m | 6.5 m |
| 25 % | 4 m | 3 m | 3.8 m |
| 35 % | 2.9 m | 1.9 m | 2.7 m |
| 50 % | 2 m | too narrow | 1.8 m |
Kinds.
- Level benches: for irrigated crops and rice, and in dry country.
- Back-sloping benches: tilted 2–5 % back into the hill, with a small drain along the foot of each riser falling about 1 in 200 to a grassed waterway. Best for wet hills.
- Outward-sloping benches are cheaper but still erode; use them only as a step towards proper benches.
Work from the top of the slope down, so rain from bare, unfinished ground above never pours over finished terraces. Strip and set aside the topsoil, shape each bench in subsoil, then spread the topsoil back. Build a lip 15–20 cm high along the outer edge of each bench. Grass earth risers at once, and never plough them.
The labour is large: on a 25 % slope about 1,000–1,500 cubic metres of earth must be moved per hectare, roughly 400–800 days of one person's digging, more with stone walls. Terraces are built over years by a whole community, and repay it for centuries.
Check dams and gullies
A gully grows uphill from its head with every storm. Stop it early.
- Take the water away first. Dig a small diversion bank and ditch above the gully head to lead runoff to a grassed waterway or a stony slope. Fence out livestock.
- Build dams from the top down. Each dam is low, 0.3–1 m high.
- Space them head to toe: the crest of each dam level with the foot of the next one upstream. Spacing = dam height ÷ gully slope. A 0.5 m dam in a gully falling 5 % (1 in 20) needs the next dam 10 m upstream.
- Key them in. Dig the dam 30–50 cm into the gully floor and into both sides, so water cannot go under or round it.
- Spillway notch: make the middle of the crest 20–30 cm lower than the ends, wide enough for a flood, so water falls over the centre, never round the ends.
- Apron: lay stones or brushwood downstream for 1–1.5 times the dam's height, so the falling water does not dig a hole that undermines the dam.
Kinds of dam:
- Brushwood: two rows of stakes 5–8 cm thick, 30–50 cm apart in the row, rows 30–50 cm apart, driven 50 cm in; brushwood packed between them, butts upstream, tied down with wire or withies. Use live willow or poplar stakes and they will root and hold the gully for good (Firewood and Coppicing).
- Woven wattle: withies woven between one row of stakes, backed with turf or straw.
- Loose stone: stones of 15–40 cm, the biggest at the bottom and the face, the dam 2–3 times as wide at the base as it is high.
Plant grass, reeds or willow cuttings in the silt behind each dam, and raise the dam in stages. At the gully head, cut the vertical lip back to a gentle slope and line it with stones or turf, or it keeps eating uphill.
How to tell it worked
- Drains run within hours of heavy rain and keep trickling for one to three days afterwards, then stop. Test pits between drains show the water table falling below 60 cm within two days after rain.
- The field is ready to plough earlier in spring; crops are even, with no yellow, stunted wet patches.
- On slopes, runoff after a storm is clear or barely cloudy, silt builds up behind banks and dams, and gullies grass over.
Note Troubleshooting. Wet patch over a drain line → a tile has broken or the line is blocked by silt or roots. Dig down at the wet spot, clear it and relay. Willow, poplar and ash roots seek out drains; keep such trees 20–30 m away. Drain outlet clogged with orange slime → iron ochre from iron-rich water. Rod or flush the line regularly; leave the outlet open to the air. Drain never runs → it is above the water, the outfall is drowned, or the trench floor has a hump. Check the fall. Mole channels collapse within a year → too sandy, pulled when too wet or too dry, or the leg too shallow. Contour bank overtopped and breached → banks too low or too far apart, or a low spot along the crest. Rebuild higher, closer, with a protected spillway at one end. Check dam washed round its end → not keyed into the banks, or no spillway notch. Terrace riser slumps → too steep, not grassed, or water pouring over the bench edge; build the lip and drain the bench.
Dangers
Danger Trenches collapse. A narrow drain trench a metre deep in wet ground can fold in without warning and bury a kneeling digger to the chest, which is enough to kill by crushing. Never work in a trench deeper than your waist in wet, sandy or recently dug ground without shoring it with planks and struts, and never dig alone. Use long-handled draining tools so you work from the top.
Danger A rope under load is a whip. When a mole plough or winch rope snaps, the free ends fly back faster than you can move. Stand well to the side of any rope under tension, never astride it, and keep children and animals away.
- Ditch water can carry leptospirosis from rat urine, which enters through cuts and the eyes: cover cuts and wash after work (Infectious Diseases). In warm countries, wading in slow ditches risks snail fever (Irrigation).
- Deep ditches drown children and livestock, especially with soft bottoms. Fence them near paths and houses.
- Terraces and saturated slopes can slide. Never let water pour over or pond on terraces on steep ground; drain them.
- Downstream. Drainage sends water and dissolved fertiliser downstream faster. Do not drain wetlands that feed wells, fish ponds or springs others rely on. Drained peat shrinks and burns away: at Holme Fen in England, a post set flush with the ground in 1851 now stands about 4 m clear of it.
What this unlocks
Drained, protected land gives bigger and surer harvests (Farming from Seed, The Great Staple Crops), earlier ploughing for The Tractor and The Plough work, and healthier livestock. The same skills lay out Roads and Bridges drainage, Sewers and Wastewater, Canals and Locks and the spillways of Dams and Reservoirs. Silted check dams and contour hedges are the start of Forestry and Tree Nurseries on ruined slopes.
How it was first done
The Roman farming writers Cato and Columella described ditches and covered drains filled with stones, brushwood or straw. Terraced hillsides were built independently in the Andes, the Mediterranean, Yemen, China and the Philippines; some have been farmed for more than two thousand years. In the 1630s–1650s the Dutch engineer Cornelius Vermuyden drained the fens of eastern England with great cuts and banks. Mole ploughs were in use in England by the late 1700s. In 1831 James Smith of Deanston in Scotland published his system of "thorough drainage", parallel drains under whole fields, and the hand-worked tile presses of the 1840s, with government drainage loans from 1846, spread clay tile drains across Britain. John Fowler pulled draining ploughs with steam engines and cables from the 1850s. Thomas Jefferson praised "horizontal" contour ploughing on his Virginia farm in the 1810s. After the Dust Bowl of the 1930s, Hugh Hammond Bennett led the new US Soil Conservation Service (1935) in spreading contour farming, terraces and grassed waterways, and from the 1980s vetiver hedges were promoted across the tropics.